Difference between revisions of "Pedestal Setup"

From Hall A Wiki
Jump to: navigation, search
(New page: 1) Do a run with no High Voltage and coincidence 1 2) Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory 3) emacs plotped_richard.C and change the root file ...)
 
 
Line 1: Line 1:
1) Do a run with no High Voltage and coincidence 1
+
*Do a run with no High Voltage on GEM and coincidence 1
 
+
*Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory
2) Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory
+
*start Root: root
 
+
*In root type : .x gem_open.C ( enter run number)
3) emacs plotped_richard.C and change the root file to the run.
+
*In root type : .x gem_plotped_mkj_xb.C
 
+
*emacs db_T.gem.dat under analyzer/DB/<Latest date>/
4) root plotped_richard.C to get X and Y peds
+
*Copy and paste new peds into the file.
 
+
5) emacs db_T.gem.dat under analyzer/DB/<Latest date>/
+
 
+
6) Copy and paste new peds into the file.
+

Latest revision as of 14:55, 31 May 2011

  • Do a run with no High Voltage on GEM and coincidence 1
  • Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory
  • start Root: root
  • In root type : .x gem_open.C ( enter run number)
  • In root type : .x gem_plotped_mkj_xb.C
  • emacs db_T.gem.dat under analyzer/DB/<Latest date>/
  • Copy and paste new peds into the file.