Difference between revisions of "G2p optics procedure"

From Hall A Wiki
Jump to: navigation, search
(New page: === Intial Conditions === <pre> Beam Energy: 1.162 GeV (Assuming first pass beam is available) Septum angle: 5 Degrees HRS and septum polarity: negative Sieve-slit:...)
 
(Intial Conditions)
Line 1: Line 1:
=== Intial Conditions ===  
+
=== Initial Conditions ===  
 
<pre>
 
<pre>
Beam Energy:            1.162 GeV (Assuming first pass beam is available)
+
Beam Energy:            1.160 GeV (first pass beam)
Septum angle:            5 Degrees
+
Septum angle:            5.7 Degrees
 
HRS and septum polarity: negative
 
HRS and septum polarity: negative
 
Sieve-slit:              IN
 
Sieve-slit:              IN
 
Raster:                  Off
 
Raster:                  Off
 
Target:                  No Target
 
Target:                  No Target
Left HRS Momentum:      1.16 GeV/c
+
Left HRS Momentum:      1.159 GeV/c (elastic carbon)
Right HRS Magnets:      Off (except septum)
+
Right HRS Magnets:      1.159 GeV/c (elastic carbon)
 
</pre>
 
</pre>
  
 
(This plan assumes that the raster size and nominal beam position have already been previously established.)
 
(This plan assumes that the raster size and nominal beam position have already been previously established.)

Revision as of 16:31, 14 June 2011

Initial Conditions

Beam Energy:             1.160 GeV (first pass beam)
Septum angle:            5.7 Degrees
HRS and septum polarity: negative
Sieve-slit:              IN
Raster:                  Off
Target:                  No Target
Left HRS Momentum:       1.159 GeV/c (elastic carbon)
Right HRS Magnets:       1.159 GeV/c (elastic carbon)

(This plan assumes that the raster size and nominal beam position have already been previously established.)