Difference between revisions of "Agenda and Minutes for 2012/02/15"

From Hall A Wiki
Jump to: navigation, search
(New page: * CLEO magnet Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet. [http://hallaw...)
 
Line 1: Line 1:
 
* CLEO magnet  
 
* CLEO magnet  
Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet.
+
Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet.  
[http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pptx pptx] [http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pdf pdf]
+
[http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pptx pptx] [http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pdf pdf] ( There are more slides than what were shown in the meeting. )
 +
 
  
 
* For GEM readout design, Nilanga needs some input from tracking by sometime in April.
 
* For GEM readout design, Nilanga needs some input from tracking by sometime in April.
  
 
* Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.
 
* Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.

Revision as of 12:48, 16 February 2012

  • CLEO magnet

Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet. pptx pdf ( There are more slides than what were shown in the meeting. )


  • For GEM readout design, Nilanga needs some input from tracking by sometime in April.
  • Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.