Pending issues
 
Pending issues
 
*HRS
 
*HRS
** FPP and DVCS electronics space
+
** FPP and DVCS electronics space ( Jack )
 
*Stand
 
*Stand
** interference sieve box, DVCS stand
+
** interference sieve box, DVCS stand ( Gavalya, DVCS collaboration )
 
*Target
 
*Target
** Length of racetrack cell
+
** Length of racetrack cell ( Bogdan )
  
  
Line 19: Line 19:
 
*HV
 
*HV
 
*HRS calibration
 
*HRS calibration
*Beamline cablibration
+
*Beamline calibration
 
*dead time
 
*dead time
 
*lumi
 
*lumi
Line 34: Line 34:
 
|-
 
|-
 
|Alexandre Camsonne
 
|Alexandre Camsonne
| ARS DAQ, Slow control, decoding, paperwork
+
| HRS DAQ, DVCS DAQ, Compton
 
| Trigger
 
| Trigger
 
|  
 
|  
Line 77: Line 77:
 
  | Setup DVCS crates in HRS  
 
  | Setup DVCS crates in HRS  
 
|-
 
|-
|Eric Fuchey
+
|Ole Hansen
| Calibration pi0, Photon Compton, RG213
+
| Software, Tracking
 
|
 
|
 
|
 
|
 
|
 
|
| RG213
+
|  
 
|-
 
|-
|Florian Itard
+
|Dave Meekins
| Shift schedule, RG213
+
| Target
 
|
 
|
 
|
 
|
Line 91: Line 91:
 
|
 
|
 
|-
 
|-
|Magalie Magne
+
|Doug
| Electronics ARS + Calorimeter triggger
+
| Beamline
 
|
 
|
 
|
 
|
Line 98: Line 98:
 
|
 
|
 
|-
 
|-
| Hisham Albataineh
+
| Eric Christy
 +
|Run Plan
 +
*
 +
|
 
|  
 
|  
*RG213
 
*BPMs cabling
 
*Trigger cabling
 
 
|
 
|
| RG213
+
|  
|
+
| RG213
+
 
|-
 
|-
|Carlos Munoz
+
|Al Gavalya
| Software, Survey, (Elastic calibration ?),MySQL
+
| Design
 
|
 
|
 
|  
 
|  
   *adaq software
+
   *adaq
  *Waveform analysis
+
  *Survey
+
 
|
 
|
 
|
 
|
 
|-
 
|-
|Julie Roche
 
| Software, curing, cosmics paddle
 
| DVCS analysis on adaq
 
 
|
 
|
| DVCS analysis on adaq
+
|  
 +
|
 +
|
 +
|
 
|
 
|
 
|-
 
|-
|Charles Hyde
 
| Run plan
 
 
|
 
|
| Run plan
+
|
| Run plan
+
|
 +
|
 +
|
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| Robert Michaels
 
| Robert Michaels
| Helicity, HRS trigger, CompSimple
+
| DAQ, Beamline
 
|
 
|
 
|
 
|
 
*Helicity
 
*Helicity
*HRS trigger
+
 
*CompSimple
+
 
|
 
|
* 80 % - checks left ?
+
 
* 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
+
*
+
 
|
 
|
 
|
 
|
 
|-
 
|-
|Sophia Iqbal ( until august 31st )
+
|
| <s>Online GUI, EPICS start/end run</s>
+
|  
 
|
 
|
 
|
 
|
Line 155: Line 149:
 
|
 
|
 
|-
 
|-
|Kalyan Allada
+
|
| Lumi
+
|  
 
|
 
|
 
|
 
|

Revision as of 17:21, 25 September 2012

Back to DVCS

Previous tables

Task assignement August 15th 2010

Pending issues

  • HRS
    • FPP and DVCS electronics space ( Jack )
  • Stand
    • interference sieve box, DVCS stand ( Gavalya, DVCS collaboration )
  • Target
    • Length of racetrack cell ( Bogdan )


Experiment tasks

  • scalers
  • sync check
  • HV
  • HRS calibration
  • Beamline calibration
  • dead time
  • lumi


Name Expertise Secondary expert Task list Completion level / Completed / Left to be done Estimated completion date Main task
Alexandre Camsonne HRS DAQ, DVCS DAQ, Compton Trigger
 * ARS test readout
 * ARS final readout
 * Buffering test
 * DVCS HRS Trigger implementation
 * Test decoder
 *  Slow control LED 
 * Slow control current ADC
 * HRS integration
 * COO
 * ESAD
 * RSAD
 * TOSP
 * 100 % ( need implement checks and not working 100 % )
 * 60 % ( crates being added )
 * 90 % ( seems to work - need synch check )
 * 60% (  )
 * 70 % ( need implement checks - several ROCs)
 * 100 % ( hardware ok - need write C functions driver and ROOT interface )
 * 95 % ( Full test with calo )
 * 80% ( waiting for crates to be in HRS )
 * 90 % ( need edit files ) 
 * 30 % ( need adapt to DVCS )
 * 100 % ( Pavel waiting to send for signatures )
 * 0 % ( still not found old one )
 * NA
 * Aug 30 th
 * in progress 08/25/2010
 * 08/30/2010
 * 08/30/2010 
 * 08/25/2010 ( 1 day )
 * 08/30/2010 ( cabling needed )
 * when everything in HRS, no later than september
 * 08/25/2010
 * 08/30/2010
 * 09/5/2010
 * 09/01/2010 
Setup DVCS crates in HRS
Ole Hansen Software, Tracking
Dave Meekins Target
Doug Beamline
Eric Christy Run Plan
Al Gavalya Design
 *adaq

Robert Michaels DAQ, Beamline
  • Helicity
Lumi

}