2:05-2:15 [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/CAB_2014-08-20.pdf Fall] and [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/12GeV_CEBAF_Schedule_FY13-FY16-Spring2015.pdf Spring] Schedule Thia Keppel<br> | 2:05-2:15 [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/CAB_2014-08-20.pdf Fall] and [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/12GeV_CEBAF_Schedule_FY13-FY16-Spring2015.pdf Spring] Schedule Thia Keppel<br> | ||
2:15-2:30 Readiness Review Requirements Doug Higinbotham <br> | 2:15-2:30 Readiness Review Requirements Doug Higinbotham <br> | ||
− | 2:30-2:40 Beamline | + | 2:30-2:40 Beamline Doug Higinbotham<br> |
2:40-2:55 [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/Target_Status.pptx Targets] Dave Meekins<br> | 2:40-2:55 [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/Target_Status.pptx Targets] Dave Meekins<br> | ||
2:55-3:05 HRS Magnets Status Jack Segal<br> | 2:55-3:05 HRS Magnets Status Jack Segal<br> |
Latest revision as of 22:18, 4 September 2014
Info
Time and location
Date: Thursday, September 4, 2014
Time: 2:00 PM to 5:00 PM
Location: JLab CEBAF F113
Communication
Phoneline:
US 1-888-240-2560 you should have received an email with the access code.
Remote desktop sharing: BlueJeans, join as a PARTICIPANT with the same access code used for the conference line.
note: this screen sharing system is from the same company providing our conference phone system.
Upload talks
You can upload talks on any jlab CUE machine (like jlabl1) at the directory /group/halla/www/hallaweb/html/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014
Then make a link in the agenda with the address like "http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Collab_Meetings/Sept_4_2014/"+"yourfilename"
or if you encounter any problem, ask or send the talk to Vince Sulkosky or to Kalyan Allada
Agenda
2:00-2:05 Welcome Shalev Gilad
2:05-2:15 Fall and Spring Schedule Thia Keppel
2:15-2:30 Readiness Review Requirements Doug Higinbotham
2:30-2:40 Beamline Doug Higinbotham
2:40-2:55 Targets Dave Meekins
2:55-3:05 HRS Magnets Status Jack Segal
3:05-3:20 Angle measurements and wire target Kalyan Allada
3:20-3:40 Detector Status Longwu Ou/Yang Wang
3:40-3:50 Break
3:50-3:55 Optics Software Vince Sulkosky
3:55-4:10 DAQ Barak Schmookler
4:10-4:25 Spectrometer Simulation Eric Christy
4:25-4:45 Runplan (commissioning and calibrations) Eric Christy
4:45-5:00 Discussion, Concerns, Manpower, Action items
5:00 Adjourn