Difference between revisions of "Run Plan (DVCS3)"
From Hall A Wiki
(→Commissioning) |
(→Commissioning) |
||
Line 1: | Line 1: | ||
− | ==Commissioning == | + | == Commissioning/ Calibration == |
=== Beam instruments === | === Beam instruments === | ||
==== BCM ==== | ==== BCM ==== |
Revision as of 14:04, 9 September 2014
Contents
Commissioning/ Calibration
Beam instruments
BCM
BPMs
Moeller
Compton
Luminosity
HRS
DAQ
12 GeV Era Run Schedule
youplal
12 GeV Era Run Schedule
more of that
12 GeV Era Run Schedule
and even more