Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
(Commissioning/ Calibration)
(Commissioning/ Calibration)
Line 5: Line 5:
 
==== Moeller ====
 
==== Moeller ====
 
==== Compton ====
 
==== Compton ====
==== Helicity reporting ====
 
  
 
=== Luminosity ===
 
=== Luminosity ===
Line 12: Line 11:
  
 
=== HRS ===
 
=== HRS ===
 +
====Measure S2m, Cerenkov and wire chamber efficiencies ===
  
 
=== Calorimeter ===
 
=== Calorimeter ===
 
==== DC readings ====
 
==== DC readings ====
==== Elastic Calibration ===
+
=== Elastic Calibration ===
  
 
==12 GeV Era Run Schedule ==
 
==12 GeV Era Run Schedule ==

Revision as of 14:25, 9 September 2014

Commissioning/ Calibration

Beam instruments

BCM

BPMs

Moeller

Compton

Luminosity

Target Boiling

Deadtime check

HRS

=Measure S2m, Cerenkov and wire chamber efficiencies

Calorimeter

DC readings

Elastic Calibration

12 GeV Era Run Schedule

youplal

12 GeV Era Run Schedule

more of that

12 GeV Era Run Schedule

and even more