Difference between revisions of "Wednesday, November 19: OWL Shift"

From Hall A Wiki
Jump to: navigation, search
 
Line 8: Line 8:
 
* Instructions for this shift
 
* Instructions for this shift
 
** The target operator is required to supervise the cryo-target.
 
** The target operator is required to supervise the cryo-target.
** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, P<sub>LHRS</sub>=2.71 GeV,  Theta_HRS=22.83, Theta_calo=12.35
+
** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, P<sub>LHRS</sub>=1.1981 GeV,  Theta_HRS=22.83, Theta_calo=12.35
 
** Make sure to use the DVCS configuration for all runs.
 
** Make sure to use the DVCS configuration for all runs.
 
** The Hall should already be in <b>Beam Permit</b> at the start of this shift.
 
** The Hall should already be in <b>Beam Permit</b> at the start of this shift.
 
** Beam studies are expected to begin at 7:00 AM.  <b>Hall A will remain in Beam Permit during beam studies to faciliate the work required to achieve reasonable current CW beam.</b>
 
** Beam studies are expected to begin at 7:00 AM.  <b>Hall A will remain in Beam Permit during beam studies to faciliate the work required to achieve reasonable current CW beam.</b>

Latest revision as of 10:53, 19 November 2014

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
  • Instructions for this shift
    • The target operator is required to supervise the cryo-target.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=1.1981 GeV, Theta_HRS=22.83, Theta_calo=12.35
    • Make sure to use the DVCS configuration for all runs.
    • The Hall should already be in Beam Permit at the start of this shift.
    • Beam studies are expected to begin at 7:00 AM. Hall A will remain in Beam Permit during beam studies to faciliate the work required to achieve reasonable current CW beam.