Difference between revisions of "Preparations-DOE2015-Nov-Review"
From Hall A Wiki
Line 6: | Line 6: | ||
===DOE 2015 review === | ===DOE 2015 review === | ||
* Draft [https://hallaweb.jlab.org/wiki/images/d/da/SBS_Agenda_2015.pdf agenda]. | * Draft [https://hallaweb.jlab.org/wiki/images/d/da/SBS_Agenda_2015.pdf agenda]. | ||
− | * | + | * Dry run talks: |
+ | ** SBS Science Update and Overview (Wojtsekhowski) | ||
+ | **SBS Project: Cost, Schedule and Management (Jones) | ||
+ | ** Dependency overview (Keppel) | ||
+ | **WBS 1 – SBS Basic: Magnet and Infrastructure (Wines) | ||
+ | **WBS 2 – Neutron Form Factor: CDet (Khandaker) | ||
+ | **WBS 3 – Proton Form Factor: GEM (Liyanage) | ||
+ | **DAQ VME and Fastbus (Moffitt) | ||
+ | **Background MC – all experiments (Riordan) | ||
+ | **Breakout: Dependencies (Room B207) | ||
+ | ***Polarized 3He target (Cates) | ||
+ | *** HCal ( Franklin) | ||
+ | ***ECal (Riordan) | ||
+ | ***GRINCH (Averett) |
Revision as of 13:05, 25 September 2015
Response to DOE 2014 review report
- Final report from DOE Nov 2014 SBS review.
- DOE Nov 2014 recommendations with responses. Initial response to the recommendations and comments.
DOE 2015 review
- Draft agenda.
- Dry run talks:
- SBS Science Update and Overview (Wojtsekhowski)
- SBS Project: Cost, Schedule and Management (Jones)
- Dependency overview (Keppel)
- WBS 1 – SBS Basic: Magnet and Infrastructure (Wines)
- WBS 2 – Neutron Form Factor: CDet (Khandaker)
- WBS 3 – Proton Form Factor: GEM (Liyanage)
- DAQ VME and Fastbus (Moffitt)
- Background MC – all experiments (Riordan)
- Breakout: Dependencies (Room B207)
- Polarized 3He target (Cates)
- HCal ( Franklin)
- ECal (Riordan)
- GRINCH (Averett)