Difference between revisions of "Preparations-DOE2015-Nov-Review"
From Hall A Wiki
(→DOE 2015 review) |
|||
Line 6: | Line 6: | ||
===DOE 2015 review === | ===DOE 2015 review === | ||
* Draft [https://hallaweb.jlab.org/wiki/images/d/da/SBS_Agenda_2015.pdf agenda]. | * Draft [https://hallaweb.jlab.org/wiki/images/d/da/SBS_Agenda_2015.pdf agenda]. | ||
− | * | + | * Initial Drafts due by October 21st for posting to wiki and overview by collaboration. |
** SBS Science Update and Overview (Wojtsekhowski) | ** SBS Science Update and Overview (Wojtsekhowski) | ||
**SBS Project: Cost, Schedule and Management (Jones) | **SBS Project: Cost, Schedule and Management (Jones) | ||
Line 15: | Line 15: | ||
**DAQ VME and Fastbus (Moffitt) | **DAQ VME and Fastbus (Moffitt) | ||
**Background MC – all experiments (Riordan) | **Background MC – all experiments (Riordan) | ||
− | **Breakout: Dependencies | + | **Breakout: Dependencies |
***Polarized 3He target (Cates) | ***Polarized 3He target (Cates) | ||
*** HCal ( Franklin) | *** HCal ( Franklin) | ||
***ECal (Riordan) | ***ECal (Riordan) | ||
***GRINCH (Averett) | ***GRINCH (Averett) | ||
+ | * Dry run talks ( on Nov 5th): |
Revision as of 18:06, 2 October 2015
Response to DOE 2014 review report
- Final report from DOE Nov 2014 SBS review.
- DOE Nov 2014 recommendations with responses. Initial response to the recommendations and comments.
DOE 2015 review
- Draft agenda.
- Initial Drafts due by October 21st for posting to wiki and overview by collaboration.
- SBS Science Update and Overview (Wojtsekhowski)
- SBS Project: Cost, Schedule and Management (Jones)
- Dependency overview (Keppel)
- WBS 1 – SBS Basic: Magnet and Infrastructure (Wines)
- WBS 2 – Neutron Form Factor: CDet (Khandaker)
- WBS 3 – Proton Form Factor: GEM (Liyanage)
- DAQ VME and Fastbus (Moffitt)
- Background MC – all experiments (Riordan)
- Breakout: Dependencies
- Polarized 3He target (Cates)
- HCal ( Franklin)
- ECal (Riordan)
- GRINCH (Averett)
- Dry run talks ( on Nov 5th):