Difference between revisions of "G2p optics"
From Hall A Wiki
(→Links) |
|||
Line 15: | Line 15: | ||
==Calibration Results== | ==Calibration Results== | ||
+ | *[[1.158GeV 2.5T Transverse]] | ||
*[[1.706GeV 2.5T Transverse]] | *[[1.706GeV 2.5T Transverse]] | ||
*[[2.254GeV 5.0T Longitudinal]] | *[[2.254GeV 5.0T Longitudinal]] |
Revision as of 15:19, 17 November 2015
Contents
Run Plan
- Summary of g2p Optics Plan
- 2.253GeV_0T_optics_runplan
- 2.253GeV_2.5T_90deg_optics_runplan
- 2.253GeV_2.5T_90deg_optics_runplan (403216)
- 1.706GeV_2.5T_90deg_optics_runplan
- 1.159GeV_2.5T_90deg_optics_runplan
Run List
Calibration Results
Links
Target field mapping:
Suggestions of the run plan: