Difference between revisions of "Production Run Plan R-HRS"

From Hall A Wiki
Jump to: navigation, search
(Proton Elastic Kinematics)
(Proton Elastic Kinematics)
Line 23: Line 23:
 
     <td>4.481</td>
 
     <td>4.481</td>
 
     <td>1.547</td>
 
     <td>1.547</td>
     <td>48.74</td>
+
     <td>52.91</td>
 
     <td>5.5</td>
 
     <td>5.5</td>
 
     <td>1.4</td>
 
     <td>1.4</td>
Line 32: Line 32:
 
   <td>2 x 2  mm<sup>2</sup></td>
 
   <td>2 x 2  mm<sup>2</sup></td>
 
     <td>4.481</td>
 
     <td>4.481</td>
     <td>1.706</td>
+
     <td>1.547</td>
     <td>48.74</td>
+
     <td>52.91</td>
     <td>5.21</td>
+
     <td>5.5</td>
 
     <td>0.4</td>
 
     <td>0.4</td>
 
     <td>2.5 (for 3.6k events)</td>
 
     <td>2.5 (for 3.6k events)</td>

Revision as of 16:42, 15 February 2016

Proton Elastic Kinematics

* If you need to increase the spectrometer momentum setting, make sure you cycle Q2 and Q3 as per the cycling procedure.
* Elastic electron rates assume 20 μA on 15 cm LH2 target, 5 mSr acceptance.
* A GMp expert will check the data quality.
  • 2nd Pass (Ebeam = 4.5 GeV) Time estimate: 15 hours
Target Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Q2 [GeV2] Electron Rate [Hz] at 20 μA hours at 20 μA
15 cm LH2 2 x 2 mm2 4.481 1.547 52.91 5.5 1.4 7 (for 35k events)
15 cm Dummy 2 x 2 mm2 4.481 1.547 52.91 5.5 0.4 2.5 (for 3.6k events)


  • 4th Pass (Ebeam = 8.8 GeV) Time estimate: 22 days
Target Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Q2 [GeV2] Electron Rate [Hz] at 20 μA days at 20 μA
15 cm LH2 2 x 2 mm2 8.841 2.101 48.74 12.65 0.018 21 (for 32k events)
15 cm Dummy 2 x 2 mm2 8.841 2.101 48.74 12.65 ----


  • 5th Pass (Ebeam = 11.0 GeV) Time estimate: 39 days
Target Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Q2 [GeV2] Electron Rate [Hz] at 20 μA days at 20 μA
15 cm LH2 2 x 2 mm2 11.021 2.204 48.74 16.54 0.003 38 (for 10k events)
15 cm Dummy 2 x 2 mm2 11.021 2.204 48.74 16.54 ----