Difference between revisions of "Beam Line"
From Hall A Wiki
(→HARP and HARP scan procedures) |
|||
Line 10: | Line 10: | ||
== HARP and HARP scan procedures == | == HARP and HARP scan procedures == | ||
+ | |||
+ | Please follow the directions at the Harp Scan Page | ||
+ | [[http://hallaweb.jlab.org/equipment/beam/harp_halla/harp.html Harp Scan page]] | ||
== Beam raster == | == Beam raster == |
Revision as of 10:20, 30 September 2008
Contents
- 1 E06-010 Instrumentation Requirement List: Jian-Ping Chen's memo to Kees De Jager, 08/07/08
- 2 ARC energy measurement
- 3 Compton Polarimeter
- 4 HARP and HARP scan procedures
- 5 Beam raster
- 6 Beam charge monitors (BCM) and calibration procedure
- 7 Beam position monitors (BPM) and calibration procedure
- 8 Moller polarimeter and results of measurements
- 9 Scattering chamber upstream and downstream beam pipe size and window thickness
- 10 HAPPEX Luminosity (Lumi) monitors
- 11 Beam dump
E06-010 Instrumentation Requirement List: Jian-Ping Chen's memo to Kees De Jager, 08/07/08
ARC energy measurement
Compton Polarimeter
HARP and HARP scan procedures
Please follow the directions at the Harp Scan Page [Harp Scan page]