Difference between revisions of "Thursday, Mar. 03: OWL Shift"
From Hall A Wiki
Line 15: | Line 15: | ||
* Note: MCC RF recovery (8:30-11:30AM, Thursday) | * Note: MCC RF recovery (8:30-11:30AM, Thursday) | ||
Access Wish List:(controlled access)<br> | Access Wish List:(controlled access)<br> | ||
− | 1/ Doug: Series of magnet measurement <: | + | 1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br> |
+ | ->Then call MCC for controlled access<br> | ||
2/ Andrew Lumanog: (Call 327-5523) : <1hr<br> | 2/ Andrew Lumanog: (Call 327-5523) : <1hr<br> | ||
3/ Dave/Greg: check Compton laser profile : <1hr<br> | 3/ Dave/Greg: check Compton laser profile : <1hr<br> |
Revision as of 17:39, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Beam set up without Compton chicane for tonight
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
->Then call MCC for controlled access
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr
4/ Longwu/Thir: D1 BCM for RHRS
- Detailed Plan here
Upcoming event(Long Term)
- Mar/03 BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D after RF recovery done (around noon)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++