Difference between revisions of "Thursday, Mar. 03: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 3: Line 3:
  
 
<b>Previously...</b>
 
<b>Previously...</b>
** Complete energy measurement with series of Hall-A magnet (mapping)<br>
+
* Complete energy measurement with series of Hall-A magnet (mapping)<br>
 
>> HALOG [https://logbooks.jlab.org/entry/3387270]
 
>> HALOG [https://logbooks.jlab.org/entry/3387270]
** RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
+
* RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
** Set up beam through Compton chicane
+
* Set up beam through Compton chicane
  
  

Revision as of 21:48, 3 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Complete energy measurement with series of Hall-A magnet (mapping)

>> HALOG [1]

  • RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
  • Set up beam through Compton chicane




Specific mission

  • Note:

1/ Set up beam through Compton chicane
- Ciprian, Greg and Yves are tuning the beam through Compton
2/ Expect some production runs through Compton

3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow

(high beam current 30uA with FC & empty target)

Instruction: DOC1DOC2
- Experts on call (Dave/Julie/Thir/...) - Calo. HV off



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++