<b>Previously...</b>
 
<b>Previously...</b>
* Complete energy measurement with series of Hall-A magnet (mapping)<br>
+
* Complete energy measurement with series of Hall-A magnet (mapping)<br>  
>> HALOG [https://logbooks.jlab.org/entry/3387270]
+
- HALOG [https://logbooks.jlab.org/entry/3387270]
 
* RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
 
* RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
 
* Set up beam through Compton chicane
 
* Set up beam through Compton chicane
Line 16: Line 16:
 
* Note:
 
* Note:
 
1/  Set up beam through Compton chicane<br>
 
1/  Set up beam through Compton chicane<br>
- Ciprian, Greg and Yves  are tuning the beam through Compton<br>  
+
- Ciprian, Greg and Yves  are tuning the beam through Compton<br>  
 
2/ Expect some production runs through Compton <br>
 
2/ Expect some production runs through Compton <br>
 
   
 
   
 
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br>
 
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br>
 
  - Crucial: high beam current 30uA with FC & empty target <br>
 
  - Crucial: high beam current 30uA with FC & empty target <br>
 +
 
Instruction:  
 
Instruction:  
 
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]

Revision as of 21:49, 3 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Complete energy measurement with series of Hall-A magnet (mapping)
- HALOG [1]
  • RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
  • Set up beam through Compton chicane




Specific mission

  • Note:

1/ Set up beam through Compton chicane

- Ciprian, Greg and Yves  are tuning the beam through Compton

2/ Expect some production runs through Compton

3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow

- Crucial: high beam current 30uA with FC & empty target 

Instruction: DOC1DOC2
- Experts on call (Dave/Julie/Thir/...) - Calo. HV off



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++