Difference between revisions of "Thursday, Mar. 03: SWING Shift"
From Hall A Wiki
Line 3: | Line 3: | ||
<b>Previously...</b> | <b>Previously...</b> | ||
− | * Complete energy measurement with series of Hall-A magnet (mapping)<br> | + | * Complete energy measurement with series of Hall-A magnet (mapping)<br> |
− | + | - HALOG [https://logbooks.jlab.org/entry/3387270] | |
* RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam) | * RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam) | ||
* Set up beam through Compton chicane | * Set up beam through Compton chicane | ||
Line 16: | Line 16: | ||
* Note: | * Note: | ||
1/ Set up beam through Compton chicane<br> | 1/ Set up beam through Compton chicane<br> | ||
− | - Ciprian, Greg and Yves are tuning the beam through Compton<br> | + | - Ciprian, Greg and Yves are tuning the beam through Compton<br> |
2/ Expect some production runs through Compton <br> | 2/ Expect some production runs through Compton <br> | ||
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br> | 3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br> | ||
- Crucial: high beam current 30uA with FC & empty target <br> | - Crucial: high beam current 30uA with FC & empty target <br> | ||
+ | |||
Instruction: | Instruction: | ||
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] |
Revision as of 21:49, 3 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Complete energy measurement with series of Hall-A magnet (mapping)
- HALOG [1]
- RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
- Set up beam through Compton chicane
Specific mission
- Note:
1/ Set up beam through Compton chicane
- Ciprian, Greg and Yves are tuning the beam through Compton
2/ Expect some production runs through Compton
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow
- Crucial: high beam current 30uA with FC & empty target
Instruction:
DOC1DOC2
- Experts on call (Dave/Julie/Thir/...)
- Calo. HV off
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++