Difference between revisions of "Thursday, Mar. 03: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 17: Line 17:
 
1/  Set up beam through Compton chicane<br>
 
1/  Set up beam through Compton chicane<br>
 
  - Ciprian, Greg and Yves  are tuning the beam through Compton<br>  
 
  - Ciprian, Greg and Yves  are tuning the beam through Compton<br>  
 +
- HALOG [https://logbooks.jlab.org/entry/3387530]
 
2/ Expect some production runs through Compton <br>
 
2/ Expect some production runs through Compton <br>
 
   
 
   

Revision as of 22:01, 3 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Complete energy measurement with series of Hall-A magnet (mapping)
- HALOG [1]
  • RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
  • Set up beam through Compton chicane




Specific mission

  • Note:

1/ Set up beam through Compton chicane

- Ciprian, Greg and Yves  are tuning the beam through Compton
- HALOG [2]

2/ Expect some production runs through Compton

3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow

- Crucial: high beam current 30uA with FC & empty target 

Instruction: DOC1DOC2
- Experts on call (Dave/Julie/Thir/...) - Calo. HV off



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++