(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Production data (Kin48_3) <b>Specific mission</b> *** <b>Elastic measurement during DAY</b> * 6:30AM Call MCC fo...)
 
Line 10: Line 10:
 
<b>Specific mission</b>  
 
<b>Specific mission</b>  
 
*** <b>Elastic measurement during DAY</b>
 
*** <b>Elastic measurement during DAY</b>
* 6:30AM Call MCC for Controlled Access
 
* 7:30AM Change polarity and angle of LHRS (detail info(angles) will be sent to Jessi by email)
 
* 8:30AM-1:30PM CW(?pass/?current) beam with various DVCS angle calibrations with change Calo. distance(2.5/6/2m)(required multiple escorted access)
 
* 2:00PM Change polarity back and angle LHRS for production
 
* 3:00PM Resume production (15uA, LH2)
 
  
 +
- 6:30 am:
 +
      Beam Off, Call MCC to put Hall A in Controlled Access
 +
      Starting Ramping HRS-L magnets to 0
 +
- 7:30 am:
 +
    Tech in Hall, Change HRS-L Polarity, Move Angle to 40.0 deg, Set Momentum = 2.5106 GeV/c, Q1 = 1900 Amp
 +
- 8:30 am:
 +
    Elastic Angle Calibration:
 +
    DVCS Trigger s0 only in HRS trigger, Elastics with Calo in current Kin_048_3 setting  15 microAmp
 +
- 9:30 am  Escorted Access
 +
    Move Calo to 6 m, 14.0 deg       
 +
- 10:00    Elastic Energy Calibration data    20 microAmp
 +
- 10:30    Escorted Access, Move Calo to 13.1 deg
 +
- 11:00    Elastic Energy Calibration data
 +
- 11:30  Escorted Access:  Move Calo to 12.25 deg
 +
- 12:00  Elastic Energy Calibration data
 +
- 12:30  Move Calo to Kin_48_2 setting:    15.184 deg, D=2.0 m,  10 micro Amp
 +
- 13:00  Angle Calibration Data
 +
    (This puts the central elastic 7.1 GeV electrons 2.0 blocks from the physical edge of the calorimeter.)
 +
- 14:00  Controlled Access?
 +
          Ramp down HRS-L
 +
        Polarity, Angle change HRS-L to 20.244 deg to p = -3.996 GeV/c, Q1 = 1900 Amp
 +
- 15:00  Production DVCS at KIN_48_2
  
  

Revision as of 19:08, 7 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Production data (Kin48_3)



Specific mission

      • Elastic measurement during DAY
- 6:30 am:
     Beam Off, Call MCC to put Hall A in Controlled Access
     Starting Ramping HRS-L magnets to 0
- 7:30 am:
    Tech in Hall, Change HRS-L Polarity, Move Angle to 40.0 deg, Set Momentum = 2.5106 GeV/c, Q1 = 1900 Amp
- 8:30 am:
   Elastic Angle Calibration:
   DVCS Trigger s0 only in HRS trigger, Elastics with Calo in current Kin_048_3 setting  15 microAmp
- 9:30 am  Escorted Access
   Move Calo to 6 m, 14.0 deg        
- 10:00    Elastic Energy Calibration data     20 microAmp
- 10:30    Escorted Access, Move Calo to 13.1 deg
- 11:00    Elastic Energy Calibration data
- 11:30   Escorted Access:   Move Calo to 12.25 deg
- 12:00  Elastic Energy Calibration data
- 12:30  Move Calo to Kin_48_2 setting:    15.184 deg, D=2.0 m,   10 micro Amp
- 13:00  Angle Calibration Data
   (This puts the central elastic 7.1 GeV electrons 2.0 blocks from the physical edge of the calorimeter.)
- 14:00  Controlled Access?
         Ramp down HRS-L
        Polarity, Angle change HRS-L to 20.244 deg to p = -3.996 GeV/c, Q1 = 1900 Amp
- 15:00  Production DVCS at KIN_48_2


      • Back to Production run, Kin48_2
    • After Alex's work, Compton laser will be turned OFF !
  • Polarized beam at 15 uA on LH2 15 cm! (out of chicane ? )
  • DVCS is running kin_48_2 [here]
  • LHRS is partially detuned: [here]
- LHRS=3.996GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
  • beam locks: no position lock, energy lock in Arc 2: [here]
  • DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.







BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++




Please check more info on the white board in the Counting House ~!!