|10:35 || ''Break'' || | |10:35 || ''Break'' || | ||
|- | |- | ||
− | |10:50 || '''Charge Item 3''': Beam line magnetic shielding, beam analysis and commissioning || Yves Roblin (15+10) | + | |10:50 || '''Charge Item 3''': Beam line magnetic shielding, beam analysis and commissioning ([http://hallaweb.jlab.org/experiment/APEX/ERR/APEXreviewrev1.pptx pptx]) || Yves Roblin (15+10) |
|- | |- | ||
− | |11:15 || '''Charge Item 4''': Radiation level analysis | + | |11:15 || '''Charge Item 4''': Radiation level analysis ([http://hallaweb.jlab.org/experiment/APEX/ERR/APEX_RadiationLevelAnalysis.pdf pdf]) || Maduka Kaluarachchi (20+15) |
|- | |- | ||
|11:50 || '''Charge Item 5''': Status of equipment (detectors) ([http://hallaweb.jlab.org/experiment/APEX/ERR/APEX_Equipment_Readiness_V4.pdf pdf]) || Gregg Franklin (15+5) | |11:50 || '''Charge Item 5''': Status of equipment (detectors) ([http://hallaweb.jlab.org/experiment/APEX/ERR/APEX_Equipment_Readiness_V4.pdf pdf]) || Gregg Franklin (15+5) |
Revision as of 10:36, 25 March 2016
Overview
Experimental Readiness Review 2016
Time and Location
- Date: 07 April 2016 (Thursday)
- Location: JLab CEBAF Room F224-F225
Agenda (talks)
8:30 | Closed Session | |
9:00 | Remarks from Chair and Charge | Chair, ERR Committee |
9:10 | Physics overview | Philip Schuster (15+5) |
9:30 | Charge Item 1&5: Design of the beam line items (excluding target) | Robin Wines (20+10) |
10:00 | Charge Item 2&5: Target design, thermal analysis and plans for the target (including decommissioning) | Silviu Covrig (20+15) |
10:35 | Break | |
10:50 | Charge Item 3: Beam line magnetic shielding, beam analysis and commissioning (pptx) | Yves Roblin (15+10) |
11:15 | Charge Item 4: Radiation level analysis (pdf) | Maduka Kaluarachchi (20+15) |
11:50 | Charge Item 5: Status of equipment (detectors) (pdf) | Gregg Franklin (15+5) |
12:10 | Working Lunch | |
Afternoon | ||
13:30 | Charge Items 6&7: Equipment installation plan | Jessie Butler (20+10) |
14:15 | Charge Item 8: Responsibilities for carrying out each job (pptx) | Bogdan Wojtsekhowski (10+5) |
14:30 | Charge Item 9: Documentation for all | Rouven Essig (15+5) |
14:50 | Charge Item 9: Readiness of DAQ full rate capability (pdf) | Kalyan Allada (10+5) |
15:05 | Charge Item 9: High-rate events analysis (pdf) | Seamus Riordan (10+5) |
15:20 | Closed Session | |
18:10 | Close Out |