Difference between revisions of "Monday, Apr. 4: DAY Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans <b>Tentative</b> * With Yves help send beam through the Compton chicane - check for updates on running conditions <b>Specific mission</b> *...) |
|||
Line 18: | Line 18: | ||
- PreScaleL : PS9 =1, + DVCS config.<br><br> | - PreScaleL : PS9 =1, + DVCS config.<br><br> | ||
- Raster : 2x2mm^2 | - Raster : 2x2mm^2 | ||
+ | |||
+ | |||
+ | <b>General Info</b> | ||
+ | |||
+ | |||
+ | <b>Harp scan</b> | ||
+ | |||
+ | When in need of asking MCC for a harp scan don't forget to mention that the raster should be OFF. | ||
+ | |||
+ | |||
+ | <b>Beam centering</b> | ||
+ | |||
+ | Before starting checking the beam (the profile with harp scans, its centering with the raster target or the C hole target, etc.) don't forget to turn OFF the DVCS calo HV, and also the HV on the VDCs. | ||
+ | When ready for production don't forget to turn them back on. | ||
Revision as of 20:43, 3 April 2016
Go back to Daily Run Plan Daily Run Plans
Tentative
- With Yves help send beam through the Compton chicane - check for updates on running conditions
Specific mission
- Production on LH2
DVCS: Kin_48_4
- 15uA
- LH2 target
- DVCS ON
- Calo_theta= 10.1(deg), Distance = 2.5m (from target) - LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- RHRS=2.204GeV, angle=48.75(deg)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- Raster : 2x2mm^2
General Info
Harp scan
When in need of asking MCC for a harp scan don't forget to mention that the raster should be OFF.
Beam centering
Before starting checking the beam (the profile with harp scans, its centering with the raster target or the C hole target, etc.) don't forget to turn OFF the DVCS calo HV, and also the HV on the VDCs. When ready for production don't forget to turn them back on.
BPM/Spot++ Check
- After a period of 3 hours or more without beam (like beam study, pass change,...) ask MCC to run 5uA 2 by 2 rastered beam on the carbon hole target and make sure you can see the hole (use Spot++ to analyze the C hole run)