Difference between revisions of "Preparations-DOE2016-Nov-Review"
From Hall A Wiki
Line 7: | Line 7: | ||
</ol> | </ol> | ||
− | ===DOE | + | ===DOE 2016 review ( Nov 7 and 8th ) === |
* Agenda. | * Agenda. | ||
* Initial Drafts due by October 3rd for posting to wiki and overview by collaboration. | * Initial Drafts due by October 3rd for posting to wiki and overview by collaboration. |
Revision as of 11:15, 28 July 2016
Response to DOE 2015 review report
- Cover letter for DOE Nov 2015 SBS review.
- Excerpts from DOE Nov 2015 SBS review.
- report from DOE Nov 2015 SBS review.
- DOE Nov 2015 recommendations with responses. Initial response to the recommendations and comments.
DOE 2016 review ( Nov 7 and 8th )
- Agenda.
- Initial Drafts due by October 3rd for posting to wiki and overview by collaboration.
- Dry run talks sometime between Oct 17-28th. Talk are due to Review committee by Nov 3rd.
- Background Material (provide to Review committee by Oct 24th)
- PMP
- Report on the thermal annealing test of prototype calorimeter.
- Monthly reports
- Recommendations tracker document
- Conceptual design report for the polarize 3He target
- Report on trigger and DAQ