Difference between revisions of "Preparations-DOE2016-Nov-Review"

From Hall A Wiki
Jump to: navigation, search
(DOE 2016 review ( Nov 7 and 8th ))
(DOE 2016 review ( Nov 7 and 8th ))
Line 15: Line 15:
 
* Background Material (provide to Review committee by Oct 24th)
 
* Background Material (provide to Review committee by Oct 24th)
 
**PMP
 
**PMP
** Note on the beam optics by Jay Benesch.
 
**[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2016/05/report_on_ecal_prototype_test-ver3.pdf Report] on the thermal annealing test of prototype calorimeter.
 
 
**[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports]
 
**[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports]
**[https://hallaweb.jlab.org/wiki/images/5/51/Response_to_DOE_2015_November_SBS_Review.pdf Recommendations tracker document]
+
**Previous DOE Review Reports
**Conceptual design report for the polarize 3He target
+
***2014 review
**Report on trigger and DAQ
+
****[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2015/02/sbs_review_report_2014_final.pdf report].
 +
***2015 review
 +
****[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2016/04/sbs_review_report_2015_final.pdf report].
 +
**Documents for DOE 2015 Review recommendations
 +
***[https://hallaweb.jlab.org/wiki/images/5/51/Response_to_DOE_2015_November_SBS_Review.pdf Recommendations tracker document]
 +
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2016/05/report_on_ecal_prototype_test-ver3.pdf Report] on the thermal annealing test of prototype calorimeter.
 +
***Report on trigger and DAQ
 +
**Documents for DOE 2015 Review comments
 +
*** Note on the beam optics by Jay Benesch.
 +
***Conceptual design report for the polarize 3He target
 +
***[https://agenda.infn.it/conferenceOtherViews.py?view=standardshort&confId=11323 Link] to agenda and talks for the ECT Trento workshop: "Probing transverse nucleon structure at high momentum transfer"

Revision as of 11:31, 5 August 2016

Response to DOE 2015 review report

  1. Cover letter for DOE Nov 2015 SBS review.
  2. Excerpts from DOE Nov 2015 SBS review.
  3. report from DOE Nov 2015 SBS review.
  4. DOE Nov 2015 recommendations with responses. Initial response to the recommendations and comments.

DOE 2016 review ( Nov 7 and 8th )

  • Charge letter for review.
  • Panel List for review.
  • Agenda.
  • Initial Drafts due by October 3rd for posting to wiki and overview by collaboration.
  • Dry run talks sometime between Oct 17-28th. Talk are due to Review committee by Nov 3rd.
  • Background Material (provide to Review committee by Oct 24th)
    • PMP
    • Monthly reports
    • Previous DOE Review Reports
    • Documents for DOE 2015 Review recommendations
    • Documents for DOE 2015 Review comments
      • Note on the beam optics by Jay Benesch.
      • Conceptual design report for the polarize 3He target
      • Link to agenda and talks for the ECT Trento workshop: "Probing transverse nucleon structure at high momentum transfer"