Difference between revisions of "Thursday, September 15, 2016, 10:00am EDT - Compton"
From Hall A Wiki
m (→Electron detector) |
(→General) |
||
Line 19: | Line 19: | ||
** Check and see if there's anything I've missed that you think is important | ** Check and see if there's anything I've missed that you think is important | ||
** 2 items still needed on new compton: Functional VNC server and StripTool | ** 2 items still needed on new compton: Functional VNC server and StripTool | ||
+ | *** Juan Carlos: Have a VNC session running in compton:5 (I have been using it to test DAQ) | ||
* Simulation: unified GEANT4-based Monte Carlo update | * Simulation: unified GEANT4-based Monte Carlo update | ||
* Alignment still needs to be done (next week?) | * Alignment still needs to be done (next week?) |
Revision as of 17:20, 14 September 2016
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Agenda
Meeting room=F228 in Cebaf Center
General
- Ole is getting serious about turning off compton-old
- I've copied some stuff to /home/compton/compton_old on the new machine
- Check and see if there's anything I've missed that you think is important
- 2 items still needed on new compton: Functional VNC server and StripTool
- Juan Carlos: Have a VNC session running in compton:5 (I have been using it to test DAQ)
- Simulation: unified GEANT4-based Monte Carlo update
- Alignment still needs to be done (next week?)
Laser
- Replacement power supply should have shipped June 24 - delayed to November 11.
- Joe Beaufait looked at dead power supply - bad 5V supply: replacement 5 V supply in hand
- New seed laser installed
- Removed 5 W fiber amplifier and handed off to Shukui (Injector group) - he wants to check it out
- Installed 30 W amp
- Need to find polarization direction (not marked)
- Power calibration is off - need to set like 6.4 W to get 5 W. [1]
Photon Detector
- Elog entry from Brian detailing phosphorescence of PbWO4 [2]
- Detector installation
Electron detector
- Detector in Hall
- FSD and "photon stopper" valve: need to test masking
- VETROC modules ordered
- QWAD tests: JLab (Hoskins/Camsonne)
- QWAD tests: Manitoba File:PresentationQWADUofM9142016.pdf