Difference between revisions of "SBS 2017 GMn Experimental Readiness Review"

From Hall A Wiki
Jump to: navigation, search
Line 19: Line 19:
 
| 9:10  ||          Remarks from Chair and Charge      ||            Chair  (15)
 
| 9:10  ||          Remarks from Chair and Charge      ||            Chair  (15)
 
|-  
 
|-  
| 9:25  ||        '''Charge Item 1,5,5c''':  Overview, general requirements, efficiency calibration    ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])              ||        Brian Quinn (20+20)               
+
| 9:25  ||        '''Charge Item 5,5c''':  Overview, general requirements, efficiency calibration    ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])              ||        Brian Quinn (20+20)               
 
|-
 
|-
 
|10:05  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])  ||      Mark Jones (20+20)       
 
|10:05  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])  ||      Mark Jones (20+20)       

Revision as of 16:30, 8 May 2017

Overview

Super Bigbite

Experimental Readiness Review 2017

Time and Location

  • Date: 15-16 June 2017 (Thursday)
  • Location: TBA
  • ERR Committee TBA
  • ERR Charge (pdf)

Draft Agenda

Thursday Morning
x:xx Closed Session , (xx)
9:10 Remarks from Chair and Charge Chair (15)
9:25 Charge Item 5,5c: Overview, general requirements, efficiency calibration (TBD) Brian Quinn (20+20)
10:05 Charge Item 1,5: Apparatus ownership, maintenance and control;
Equipment to achieve the scientific goals; Safety Docs (TBD)
Mark Jones (20+20)
10:45 Break (15)
11:00 Charge Item 2,3: Beamline, supports,SBS and BigBite magnets, major engineering hardware (TBD) Robin Wines (30+30)
12:00 Working Lunch
Afternoon
13:00 Charge Item 2,3: HCal (TBD) Gregg Franklin (15+15)
13:30 Charge Item 2,3: Bigbite non-GEMs (TBD) Todd Averett (20+20)
14:10 Charge Item 2,3: GEMs (TBD) Nilanga Liyanage (20+20)
14:50 Break (15)
15:05 Charge Item 2,3: CDet (TBD) Peter Monaghan (15+15)
15:35 Charge Item 2: Installation (TBD) Jessie Butler (20+20)
16:15 Charge Item 3,5a: Software; GEM reconstruction efficiency at high rate (TBD) Seamus Riordan (30+30)
17:15 End
Friday Morning
9:00 Charge Item 4: Target, scattering chamber, and radiator (TBD) Keith or Meekins (15+15)
9:30 Charge Item 5b: High trigger rate capabilities. What are the expected accidentals? (TBD) Alexandre Camsonne (15+15)
10:00 Charge Item 6,7: fringe field effects; Beam commissioning / machine protection (TBD) TBD (15+15)
10:30 Charge Item 8: radiation levels, local shielding; RSAD (TBD) Andrew Puckett (20+20)
11:10 End
x:xx Closed Session
17:00 Close Out
Draft of COO (TBD)
Draft of ERG (TBD)
Draft of ESAD (TBD)
Input for RSAD from Radcon (radiation budget form) (TBD)