Difference between revisions of "Preparations-DOE2017-Closeout"
From Hall A Wiki
(→DOE 2017 Closeout (June 6th)) |
(→DOE 2017 Closeout (June 6th)) |
||
Line 3: | Line 3: | ||
*The ZOOM meeting will be coordinated by DOE (the details at a later date). | *The ZOOM meeting will be coordinated by DOE (the details at a later date). | ||
*Agenda [https://hallaweb.jlab.org/wiki/images/f/fd/SBS_Agenda_2017.pdf] | *Agenda [https://hallaweb.jlab.org/wiki/images/f/fd/SBS_Agenda_2017.pdf] | ||
+ | *Charge [https://hallaweb.jlab.org/wiki/images/9/92/SBS_Site_Charge_Letter_2017.pdf] | ||
+ | *Review panel [https://hallaweb.jlab.org/wiki/images/7/73/SBS_2017_Review_Panel_List.pdf] | ||
*Talks | *Talks | ||
**1st talk: SBS Project: COst, Schedule, Management and KPPs | **1st talk: SBS Project: COst, Schedule, Management and KPPs |
Revision as of 10:40, 21 May 2017
DOE 2017 Closeout (June 6th)
- Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS)
- The ZOOM meeting will be coordinated by DOE (the details at a later date).
- Agenda [1]
- Charge [2]
- Review panel [3]
- Talks
- 1st talk: SBS Project: COst, Schedule, Management and KPPs
- 2nd talk: Transition to Operations
- Documents
- JLab GMn Experimental Readiness Review (ERR)
- Charge [4]
- Review committee: Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation), Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q), Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)
- Agenda [5]
- Background Material
- PMP with updated organizational chart.
- Monthly reports
- Quarterly reports
- Previous DOE Review Reports
- 2013 Review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2014 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2015 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2016 review:Excerpts from review,Final report,Indico webpage.