(→Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017)) |
|||
Line 6: | Line 6: | ||
*Talks | *Talks | ||
**1st talk: SBS Project: COst, Schedule, Management and KPPs. [https://hallaweb.jlab.org/wiki/images/2/2f/SBS_Project_Closeout-v4.pdf Talk] | **1st talk: SBS Project: COst, Schedule, Management and KPPs. [https://hallaweb.jlab.org/wiki/images/2/2f/SBS_Project_Closeout-v4.pdf Talk] | ||
− | **2nd talk: Transition to Operations | + | **2nd talk: Transition to Operations (ready be Friday May 26th) |
*Documents | *Documents | ||
**Transition to Operations [https://hallaweb.jlab.org/wiki/images/c/c7/Transition_to_Operations.pdf document.] | **Transition to Operations [https://hallaweb.jlab.org/wiki/images/c/c7/Transition_to_Operations.pdf document.] | ||
Line 12: | Line 12: | ||
**Updated organizational [https://hallaweb.jlab.org/wiki/images/0/07/Org-chart-updated.pdf chart]. | **Updated organizational [https://hallaweb.jlab.org/wiki/images/0/07/Org-chart-updated.pdf chart]. | ||
**[https://hallaweb.jlab.org/wiki/images/2/26/Field_analysis.pdf Document] on HCal field analysis. | **[https://hallaweb.jlab.org/wiki/images/2/26/Field_analysis.pdf Document] on HCal field analysis. | ||
− | ** Short update on the polarized target status. | + | ** Short update on the polarized target status. (ready be Friday May 26th) |
− | ** Short update on the electron calorimeter. | + | ** Short update on the electron calorimeter. (ready be Friday May 26th) |
* JLab GMn Experimental Readiness Review (ERR) | * JLab GMn Experimental Readiness Review (ERR) | ||
** Charge [http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2017/ERR_Charge.pdf] | ** Charge [http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2017/ERR_Charge.pdf] |
Revision as of 09:54, 22 May 2017
Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017)
- The ZOOM meeting will be coordinated by DOE (the details at a later date).
- Agenda [1]
- Charge [2]
- Review panel [3]
- Talks
- 1st talk: SBS Project: COst, Schedule, Management and KPPs. Talk
- 2nd talk: Transition to Operations (ready be Friday May 26th)
- Documents
- JLab GMn Experimental Readiness Review (ERR)
- Charge [4]
- Review committee: Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation), Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q), Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)
- Agenda [5]
- Background Material
- PMP with updated organizational chart.
- Monthly reports
- Quarterly reports
- Previous DOE Review Reports
- 2013 Review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2014 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2015 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2016 review:Excerpts from review,Final report,Indico webpage.