Difference between revisions of "Preparations-DOE2017-Closeout"
From Hall A Wiki
(→Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017)) |
(→Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017)) |
||
Line 8: | Line 8: | ||
*Talks | *Talks | ||
**1st talk: SBS Project: COst, Schedule, Management and KPPs. [https://hallaweb.jlab.org/wiki/images/3/3c/SBS_Project_Closeout.pdf Talk pdf] | **1st talk: SBS Project: COst, Schedule, Management and KPPs. [https://hallaweb.jlab.org/wiki/images/3/3c/SBS_Project_Closeout.pdf Talk pdf] | ||
− | **2nd talk: Transition to Operations | + | **2nd talk: Transition to Operations [https://hallaweb.jlab.org/wiki/images/5/51/SBS_Project_Transition-to-operations.pdf Talk pdf] |
*Documents | *Documents | ||
**Transition to Operations [https://hallaweb.jlab.org/wiki/images/c/c7/Transition_to_Operations.pdf document.] | **Transition to Operations [https://hallaweb.jlab.org/wiki/images/c/c7/Transition_to_Operations.pdf document.] | ||
Line 15: | Line 15: | ||
**[https://hallaweb.jlab.org/wiki/images/2/26/Field_analysis.pdf Document] on HCal field analysis. | **[https://hallaweb.jlab.org/wiki/images/2/26/Field_analysis.pdf Document] on HCal field analysis. | ||
** Short update on the polarized target status. [https://hallaweb.jlab.org/wiki/index.php/Image:Target_sbs_closeout_update_2017_v2.pdf Report pdf] | ** Short update on the polarized target status. [https://hallaweb.jlab.org/wiki/index.php/Image:Target_sbs_closeout_update_2017_v2.pdf Report pdf] | ||
− | ** Short update on the electron calorimeter. | + | ** Short update on the electron calorimeter. [https://hallaweb.jlab.org/wiki/images/4/43/Ecal_update_may2017.pdf Report pdf] |
* JLab GMn Experimental Readiness Review (ERR) | * JLab GMn Experimental Readiness Review (ERR) | ||
** Charge [http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2017/ERR_Charge.pdf] | ** Charge [http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2017/ERR_Charge.pdf] |
Revision as of 13:29, 30 May 2017
Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017)
- The ZOOM meeting information
- Join from PC, Mac, Linux, iOS or Android: https://science.zoom.us/j/420263958
- AND join by phone: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) Meeting ID: 420 263 958
- Agenda [1]
- Charge [2]
- Review panel [3]
- Talks
- Documents
- Transition to Operations document.
- Closeout document.
- Updated organizational chart.
- Document on HCal field analysis.
- Short update on the polarized target status. Report pdf
- Short update on the electron calorimeter. Report pdf
- JLab GMn Experimental Readiness Review (ERR)
- Charge [4]
- Review committee: Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation), Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q), Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)
- Agenda [5]
- Background Material
- PMP with updated organizational chart.
- Monthly reports
- Quarterly reports
- Previous DOE Review Reports
- 2013 Review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2014 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2015 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2016 review:Excerpts from review,Final report,Indico webpage.