Difference between revisions of "SBS 2017 GMn Experimental Readiness Review"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
Line 29: Line 29:
 
|10:30  ||    '''Charge Item 2,3''': Beamline, supports,SBS and BigBite magnets, major engineering hardware  ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn-Wines-ERR2017.pdf pdf])  ||      Robin Wines (30+15)  
 
|10:30  ||    '''Charge Item 2,3''': Beamline, supports,SBS and BigBite magnets, major engineering hardware  ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn-Wines-ERR2017.pdf pdf])  ||      Robin Wines (30+15)  
 
|-
 
|-
|11:15  ||    '''Charge Item 2,3''': HCal ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])  ||      Gregg Franklin (15+5)  
+
|11:15  ||    '''Charge Item 2,3''': HCal ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCAL_GMn_ERR_Jun_2017.pdf pdf])  ||      Gregg Franklin (15+5)  
 
|-
 
|-
 
|11:35  ||    '''Charge Item 5c''': HCal efficiency calibration ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])  ||      Brian Quinn (10+5)  
 
|11:35  ||    '''Charge Item 5c''': HCal efficiency calibration ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD])  ||      Brian Quinn (10+5)  

Revision as of 17:24, 12 June 2017

Overview

Super Bigbite

Experimental Readiness Review 2017

  • Date: 15-16 June 2017 (Thursday/Friday)
  • Location: L102
  • ERR Committee Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation),

Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q),

Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)

  • ERR Charge (pdf)

Agenda

Thursday Morning
8:30 Closed Session , (30)
9:00 Remarks from Chair and Charge Chair (10)
9:10 Charge Item 5: Overview, general requirements (TBD) Brian Quinn (15+10)
9:35 Charge Item 1,5: Apparatus ownership, maintenance and control;
Equipment to achieve the scientific goals; Safety Docs (TBD)
Mark Jones (20+20)
10:15 Break (15)
10:30 Charge Item 2,3: Beamline, supports,SBS and BigBite magnets, major engineering hardware (pdf) Robin Wines (30+15)
11:15 Charge Item 2,3: HCal (pdf) Gregg Franklin (15+5)
11:35 Charge Item 5c: HCal efficiency calibration (TBD) Brian Quinn (10+5)
11:50 Charge Item 2,3: Bigbite non-GEMs (TBD) Todd Averett (20+15)
12:25 Working Lunch
Afternoon
13:30 Charge Item 2,3: GEMs (TBD) Nilanga Liyanage (20+20)
14:10 Charge Item 2,3: CDet (TBD) Peter Monaghan (15+5)
14:30 Charge Item 2: Installation (TBD) Jessie Butler (20+20)
15:10 Break (15)
15:25 Charge Item 3,5a: Software; GEM reconstruction efficiency at high rate (TBD) Seamus Riordan (30+20)
16:15 Charge Item 4: Target, scattering chamber, and radiator ([1]) David Meekins (15+5)
16:35 Charge Item 5b: High trigger rate capabilities. What are the expected accidentals? (TBD) Alexandre Camsonne (15+15)
17:05 End
Friday Morning
9:00 Charge Item 6,7: fringe field effects; Beam commissioning / machine protection (pdf) Jay Benesch (15+15)
9:30 Charge Item 8: radiation levels, local shielding; RSAD (TBD) Andrew Puckett (20+20)
10:10 End
x:xx Closed Session
13:00 Close Out
Draft of COO (TBD)
Draft of ERG (TBD)
Draft of ESAD (TBD)
Input for RSAD from Radcon (radiation budget form) (TBD)