== Minutes ==
 
== Minutes ==
 +
 +
* Task list/status
 +
** tolerance analysis (in progress)
 +
** material irradiation (new studies not begun)
 +
** radiation loads (new studies not begun)
 +
** impact of environmental variations (???)
 +
** floor loading (???)
 +
** fringe field impact (maps created, sims not run)
 +
* Status of MIT/JLAB work
 +
** funding for new work
 +
** MIT/SBU spectrometer prototype fabrication status
 +
*** a bulleted list of the objectives of prototype testing
 +
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
 +
** a breakdown of the MIT request
 +
*** coil tests
 +
*** collimator/apparatus engineering
 +
*** other activities
 +
* Next meeting
 +
 
<br><br>
 
<br><br>

Revision as of 13:48, 4 October 2017

Last meeting: Wednesday May 24, 2017 2:00pm ET


Agenda



  • Task list/status
    • tolerance analysis (in progress)
    • material irradiation (new studies not begun)
    • radiation loads (new studies not begun)
    • impact of environmental variations (???)
    • floor loading (???)
    • fringe field impact (maps created, sims not run)
  • Status of MIT/JLAB work
    • funding for new work
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting



Minutes

  • Task list/status
    • tolerance analysis (in progress)
    • material irradiation (new studies not begun)
    • radiation loads (new studies not begun)
    • impact of environmental variations (???)
    • floor loading (???)
    • fringe field impact (maps created, sims not run)
  • Status of MIT/JLAB work
    • funding for new work
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting