Difference between revisions of "Mar 20, 2018"

From Hall A Wiki
Jump to: navigation, search
Line 5: Line 5:
 
=== Status of the INFN GEM Cosmic Stand ===
 
=== Status of the INFN GEM Cosmic Stand ===
  
*Provide the FNAL Test beam update.
+
Roberto gives a detailed update on the setup of the cosmic stand for the INFN GEM layers
*They completed a scan of the multi-ZZ pattern PCB, along with gain and gap field scans.
+
* 3 chambers fully instrumented on the cosmic stand (Jo, J1 and J2), all 12 modules are holding HV very well, (nominal 4 kV with Ar-CO2 75/25)
*Have other ZZ boards we want to test as well, including micromegas based detectors with ZZ readout.
+
 
*Overall things are going well. They will report more in two weeks.
+
 
  
 
=== Status of the UVa GEM Cosmic Stand ===
 
=== Status of the UVa GEM Cosmic Stand ===

Revision as of 11:45, 20 March 2018

Link to all previous meetings: Weekly GMn GEM Commissioning Meeting


 Bogdan, Evaristo, Kondo, Leo, Nilanga, Roberto, Siyu

Status of the INFN GEM Cosmic Stand

Roberto gives a detailed update on the setup of the cosmic stand for the INFN GEM layers

  • 3 chambers fully instrumented on the cosmic stand (Jo, J1 and J2), all 12 modules are holding HV very well, (nominal 4 kV with Ar-CO2 75/25)


Status of the UVa GEM Cosmic Stand

  • They receive the new longer screws, will prepare them (cleaning etc ...) for assembly.
  • Will put the mock chamber together once more this week to check if gas leak issue is fixed with the longer screws

AOB