Difference between revisions of "Target Operator Check List"

From Hall A Wiki
Jump to: navigation, search
(After Call for a Bean on Request to MCC)
(Every Half Hour)
Line 5: Line 5:
 
* No Error in Spin Flip Control Status Window
 
* No Error in Spin Flip Control Status Window
 
* 5 Heart Beats are on for Spin Flip Main Window
 
* 5 Heart Beats are on for Spin Flip Main Window
 +
* Check Any Yellow Warning Messages or Controls
  
 
== Every 2 Hour ==
 
== Every 2 Hour ==

Revision as of 22:32, 8 November 2008

Target Operator Should Finish This check list for every shift.

Every Half Hour

  • Pumping Laser Absorption Spectrum
  • No Error in Spin Flip Control Status Window
  • 5 Heart Beats are on for Spin Flip Main Window
  • Check Any Yellow Warning Messages or Controls

Every 2 Hour

  • Check polarization drift
  • Check Cell Temperature
  • Check Oven Temperature

Every Shift

  • Generate a Report from Spin Flip Main Window
  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Laser Control Window
  • Screen Shot Cell Temperature Reading

After Call for Beam to MCC

  • Check Raster Size
  • Check Beam Current
  • Check Trigger Rate