Difference between revisions of "Target Operator Check List"
From Hall A Wiki
(→Every Half Hour) |
|||
Line 1: | Line 1: | ||
− | Target Operator Should | + | Target Operator Should Go Through This check list for every shift. |
== Every Half Hour == | == Every Half Hour == |
Revision as of 00:40, 9 November 2008
Target Operator Should Go Through This check list for every shift.
Every Half Hour
- Pumping Laser Absorption Spectrum
- No Error in Spin Flip Control Status Window
- 5 Heart Beats are on for Spin Flip Main Window
- Check Any Yellow Warning Messages or Controls
Every 2 Hour
- Check polarization drift
- Check Cell Temperature
- Check Oven Temperature
Every Shift
- Generate a Report from Spin Flip Main Window
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Laser Control Window
- Screen Shot Cell Temperature Reading
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate