Difference between revisions of "Target Operator Check List"
From Hall A Wiki
Line 16: | Line 16: | ||
* Screen Shot Pumping Laser Absorption Spectrum | * Screen Shot Pumping Laser Absorption Spectrum | ||
* Screen Shot Laser Control Window | * Screen Shot Laser Control Window | ||
− | * Screen Shot Cell Temperature Reading | + | * Screen Shot Cell Temperature Reading (Optional/Automatic) |
+ | * Screen Shot Oven Temperature Reading (Optional/AUtomatic) | ||
+ | * Screen Shot of Holding Field Current (Optional/Automatic) | ||
== After Call for Beam to MCC == | == After Call for Beam to MCC == |
Revision as of 11:29, 9 November 2008
Target Operator Should Go Through This check list for every shift.
Every Half Hour
- Pumping Laser Absorption Spectrum
- No Error in Spin Flip Control Status Window
- 5 Heart Beats are on for Spin Flip Main Window
- Check Any Yellow Warning Messages or Controls
Every 2 Hour
- Check polarization drift
- Check Cell Temperature
- Check Oven Temperature
Every Shift
- Generate a Report from Spin Flip Main Window
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Laser Control Window
- Screen Shot Cell Temperature Reading (Optional/Automatic)
- Screen Shot Oven Temperature Reading (Optional/AUtomatic)
- Screen Shot of Holding Field Current (Optional/Automatic)
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate