Difference between revisions of "Target Operator Check List"

From Hall A Wiki
Jump to: navigation, search
Line 16: Line 16:
 
* Screen Shot Pumping Laser Absorption Spectrum
 
* Screen Shot Pumping Laser Absorption Spectrum
 
* Screen Shot Laser Control Window
 
* Screen Shot Laser Control Window
* Screen Shot Cell Temperature Reading
+
* Screen Shot Cell Temperature Reading (Optional/Automatic)
 +
* Screen Shot Oven Temperature Reading (Optional/AUtomatic)
 +
* Screen Shot of Holding Field Current (Optional/Automatic)
  
 
== After Call for Beam to MCC ==
 
== After Call for Beam to MCC ==

Revision as of 11:29, 9 November 2008

Target Operator Should Go Through This check list for every shift.

Every Half Hour

  • Pumping Laser Absorption Spectrum
  • No Error in Spin Flip Control Status Window
  • 5 Heart Beats are on for Spin Flip Main Window
  • Check Any Yellow Warning Messages or Controls

Every 2 Hour

  • Check polarization drift
  • Check Cell Temperature
  • Check Oven Temperature

Every Shift

  • Generate a Report from Spin Flip Main Window
  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Laser Control Window
  • Screen Shot Cell Temperature Reading (Optional/Automatic)
  • Screen Shot Oven Temperature Reading (Optional/AUtomatic)
  • Screen Shot of Holding Field Current (Optional/Automatic)

After Call for Beam to MCC

  • Check Raster Size
  • Check Beam Current
  • Check Trigger Rate