Difference between revisions of "Run Meeting: March 8th, 2019"

From Hall A Wiki
Jump to: navigation, search
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings : [https://logbooks.jlab.org/book/halog halog] 3:30PM Run Meeting, Counting house meetin...")
 
(Status)
Line 10: Line 10:
 
==Status==
 
==Status==
  
* Beam is anticipated to be available later swing or early owl.
 
:- Day shift today is cancelled.
 
:- Swing shift takers should come to counting house by 6PM.
 
  
* Magnet:
 
:- Yesterday, tech experts worked on the magnets, issue fixed.
 
:- Log entry by Jessie: https://logbooks.jlab.org/entry/3664058
 
:- Log entry by Jack: https://logbooks.jlab.org/entry/3664057
 
:- Now, both arms are ready for beam.
 
::- Left: 1.0632, GeV Negative, ready for beam with reduced energy;
 
::- Right: 1.1040, GeV Negative, ready for optics at 1.104 GeV (old setup).
 
  
* Hall is still in controlled access. We are taking cosmic data.  
+
Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934
  
* Sieves for both arm are IN.
+
Status:
 +
 
 +
* We got beam back this morning.
 +
 
 +
* Sieves for both arms are IN. SciFi for left arm is IN.
 +
 
 +
* Now working on the planed optics data taking for RHRS.
 +
 
 +
* SciFi + tungsten wire data from LHRS were collected as well. John is analyzing them.
 +
 
 +
* Yesterday, the high voltage of RHRS VDC tripped. Alex fixed that.
 +
 
 +
* Total charge so far is ~19.6C
  
 
==So Far==
 
==So Far==

Revision as of 15:09, 8 March 2019

Back to:

Main Page
Daily Run Meetings
halog

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Jinlong Zhang

Status

Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934

Status:

  • We got beam back this morning.
  • Sieves for both arms are IN. SciFi for left arm is IN.
  • Now working on the planed optics data taking for RHRS.
  • SciFi + tungsten wire data from LHRS were collected as well. John is analyzing them.
  • Yesterday, the high voltage of RHRS VDC tripped. Alex fixed that.
  • Total charge so far is ~19.6C

So Far

  • Total charge: ~19.5C

Plan

  • When we have beam tonight, take optics data for RHRS.
- W Wire (Vertical) target: V1, V2, and V3. 1M events for each.
- Optics 1 and Optics 3 targets: 3M events for each.
- W Wire (Horizontal): two wires H2 and H3, 1M events for each.
  • Once we have RHRS optics done, get back to production running.
  • When ramping RHRS magnets, take use the time and beam to take LRHS optics data, with and without Sci.

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934