Difference between revisions of "Run Meeting: March 11th,2019"
(→Issue) |
(→Issue) |
||
Line 30: | Line 30: | ||
* During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). | * During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). | ||
+ | * At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from the four temperature sensors. Target on Call was called, and the issue may need to power cycle the target computer. | ||
+ | |||
+ | The above 2 issues need control access to the Hall, and we plan to have Jack and Target on Call to work on the issue on Monday around 10-11am. | ||
==Plan== | ==Plan== |
Revision as of 22:39, 10 March 2019
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Ye Tian
Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934
Contents
Status
https://logbooks.jlab.org/entry/3665804
- Taking the production runs during the weekend (03/09 and 03/10).
- Taking the SciFi data from run 4721~4724 (https://logbooks.jlab.org/entry/3665700 and https://logbooks.jlab.org/entry/3665708)
- The pseudo production (no LHRS NMR) with monitoring the from run 4725
Two escorted access:
1) access by ARM and John to reset SciFi motion system
2) access by Jack to reboot the LHRS IOC
Issue
- During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658).
- At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from the four temperature sensors. Target on Call was called, and the issue may need to power cycle the target computer.
The above 2 issues need control access to the Hall, and we plan to have Jack and Target on Call to work on the issue on Monday around 10-11am.
Plan
- Collect the production run data with working Right and Left HRS.
- plans for the down time during production run.
- Left HRS magnet down, then take the right HRS optics run
- Right HRS magnet down, then take the left HRS optics run
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934