Difference between revisions of "E12-17-004-ERR-29May2019"
From Hall A Wiki
(→Agenda) |
(→Document Drafts) |
||
Line 32: | Line 32: | ||
== Document Drafts == | == Document Drafts == | ||
− | * [[Media:E12-17- | + | * [[Media:E12-17-004_RSAD.pdf|E12-17-004 Radiation Safety Assessment (RSAD)]] |
− | * | + | * COO, ESAD, ERG, SBS OSPs, etc from GMn will cover E12-17-004 as well. GEM, hodoscope, and analyzer controls are identical. No hardware with unique characteristics is being added. |
− | * [[ | + | ** Draft of GMn COO ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/COO.pdf pdf]) |
+ | ** Draft of GMn ERG ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/ERG.pdf pdf]) and chart ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/ERG_chart.pdf pdf]) | ||
+ | ** Draft of GMn ESAD ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn_ESAD.pdf pdf]) | ||
+ | ** Draft of GMn OSP for GEM detectors ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMn_GEM_OSP.pdf pdf]) | ||
+ | ** Draft of GMn OSP for BigBite magnet ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/BigBite_magnet_OSP.pdf pdf]) | ||
+ | ** Draft of GMn OSP for BigBite rotation ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/BigBite_rotation_OSP.pdf pdf]) | ||
+ | ** Draft of GMn OSP GRINCH Cherenkov detector ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GRINCH_OSP.pdf pdf]) | ||
+ | ** Draft of GMn OSP for BigBite timing hodoscope ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/BB_Hodo_OSP.pdf pdf]) | ||
+ | ** Draft of GMn OSP for Hadron Calorimeter, HCal-J ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/HCal_OSP.pdf pdf]) | ||
+ | ** Draft of GMn OSP for Coordinate Detector, CDet ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/CDet_OSP.pdf pdf]) |
Revision as of 14:37, 10 May 2019
Contents
E12-17-004 Experimental Readiness Review 2019 (Hall A)
Time and Location
- Date: May 29, 2019
- Location: CEBAF Center Room L102
- ERR Charge: ERR Charge
- ERR Committee: Howard Fenker (chair), Lubomir Pentchev, Chris Cuevas, Pavel Degtiarenko, Bert Manzlak, Ed Folts (observer), Javier Gomez (observer)
Agenda
- 08:00 (25) Executive Session
- 08:25 (5) Remarks from Chair and Charge
- 08:30 (30+10) Charge Items 1, 2e, 5—8: Overview, equipment, ownership, schedule, etc -- Brad Sawatzky
- New equipment (beyond those in common with E12-09-019)
- Impact and integration with E12-09-019 run plan
- Apparatus ownership, maintenance and control, safety documentation and procedures
- E12-09-019 specific hardware, completion/commissioning schedule and tasks
- 9:10 (20+10) Charge Item 2c: Mechanical design, engineering -- Robin Wines / Chris Soova / Al Gavalya?
- 9:40 (20+10) Charge Item 2a: GEMs and associated electronics -- Kondo Gnanvo
- 10:10 ~ Coffee Break ~
- 10:30 (20+10) Charge Item 2b, 2d: Charge-Exchange polarimetry hardware -- David Hamilton
- 11:00 (20+10) Charge Item 2b, 2d: Large Angle polarimetry hardware -- Michael Kohl
- 11:30 (20+10) Charge Item 3a, 3b, 4: Simulation, analysis software and publication timeline -- Will Tireman
- 12:00 ~ Lunch ~
- 13:00 Executive Session
- 15:00 Close Out
Document Drafts
- E12-17-004 Radiation Safety Assessment (RSAD)
- COO, ESAD, ERG, SBS OSPs, etc from GMn will cover E12-17-004 as well. GEM, hodoscope, and analyzer controls are identical. No hardware with unique characteristics is being added.
- Draft of GMn COO (pdf)
- Draft of GMn ERG (pdf) and chart (pdf)
- Draft of GMn ESAD (pdf)
- Draft of GMn OSP for GEM detectors (pdf)
- Draft of GMn OSP for BigBite magnet (pdf)
- Draft of GMn OSP for BigBite rotation (pdf)
- Draft of GMn OSP GRINCH Cherenkov detector (pdf)
- Draft of GMn OSP for BigBite timing hodoscope (pdf)
- Draft of GMn OSP for Hadron Calorimeter, HCal-J (pdf)
- Draft of GMn OSP for Coordinate Detector, CDet (pdf)