Agenda
- Discussion on SoLID cost estimation according to WBS (Work Breakdown
Structure)
- Sub-system updates
Minutes
- JP: Thia, Do you want to give a summary
- Thia: I received LGC cost estimation. I think at this the point, the break down level makes sense for me, everything looks pretty good. However for a 5-year duration project, maybe it is worth to put the installation in the estimation.
- Alexandre: Does this 5-year duration include 2-year preR&D and 3-year project?
- JP: preR&D is not included in this duration.