Line 45: Line 45:
  
 
# Electron Detector
 
# Electron Detector
# QWAD  Adaptor Boards
+
## QWAD  Adaptor Boards
## Still being designed.  Not clear where they will be fabricated.
+
### Still being designed.  Not clear where they will be fabricated.
## Change needs to made to power distribution boards at JLab.  Alex will do this.
+
### Change needs to made to power distribution boards at JLab.  Alex will do this.
# QWAD
+
## QWAD
## Where are the QWAD spares?
+
### Where are the QWAD spares?
### Juliette has 1. Asking around to try find the others.
+
#### Juliette has 1. Asking around to try find the others.
# Counting DAQ
+
## Counting DAQ
## Working on VTROC readout.  
+
### Working on VTROC readout.  
 
+
 
# Laser
 
# Laser
 
## New training now in force
 
## New training now in force
 
## Finesse of cavity has dropped by at least 35%.  Mirrors will need to be changed when Dave returns in November.
 
## Finesse of cavity has dropped by at least 35%.  Mirrors will need to be changed when Dave returns in November.
 
 
# Photon Detector
 
# Photon Detector
 
## New linearity measurements for PREX
 
## New linearity measurements for PREX

Latest revision as of 15:11, 23 October 2019

Back to Main Compton Page >> Compton Meetings

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room = Cebaf Center F227

General

  • Dave G. will be out of town all next week
  • Hall will be locked up sometime around Nov. 11 for high current tests
  • Spin dance is tentatively scheduled around Nov. 20

Electron detector

  • Detector installation
  • QWAD adapter boards
  • Spare QWADs
  • Counting DAQ


Laser

  • New LOSP in effect - everyone needs LTT, new walkthrough. No one is authorized to use system until this is done.
  • Complete new laser safety training by end of month
  • Fiber amp swapped
  • Cavity gain low - mirrors seem to be problematic

Photon Detector

  • PREX checks
  • CREX preparations

Analysis

  • ACC0 - laser-cycle analysis
  • ACC4 - laser cycle analysis

Minutes

  1. Electron Detector
    1. QWAD Adaptor Boards
      1. Still being designed. Not clear where they will be fabricated.
      2. Change needs to made to power distribution boards at JLab. Alex will do this.
    2. QWAD
      1. Where are the QWAD spares?
        1. Juliette has 1. Asking around to try find the others.
    3. Counting DAQ
      1. Working on VTROC readout.
  2. Laser
    1. New training now in force
    2. Finesse of cavity has dropped by at least 35%. Mirrors will need to be changed when Dave returns in November.
  3. Photon Detector
    1. New linearity measurements for PREX
      1. Measurements not position sensitive.
      2. Compton Edge estimated to be 21k SRAU. LED set there.
    2. CREX setup
      1. Should we have 2 setups (full and half gain) or one optimized for both?