Difference between revisions of "Meeting solid preRD cher"
From Hall A Wiki
Line 18: | Line 18: | ||
*** Mirrors | *** Mirrors | ||
*** Electronic summing board board | *** Electronic summing board board | ||
+ | **** Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor. | ||
*** MAROC electronics | *** MAROC electronics | ||
*** Gas regulation system | *** Gas regulation system |
Revision as of 10:25, 9 December 2019
Meeting time is 11:00 AM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689
- Zhiwen's studies of readout test (updating from time to time) https://userweb.jlab.org/~zwzhao/maroc/mapmt_readout_1st_test.pdf
Monday, December 9th, 2017
List of topics for meeting today:
- Engineering status
- Updates on Tank Construction
- Is there adequate space in the current design for the scintillator arrays?
- Updates on Stand Construction
- Updates on Tank Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs
- Mirrors
- Electronic summing board board
- Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor.
- MAROC electronics
- Gas regulation system
- Status of lead block availability at JLab?
- Status of lemo cable availability at JLab?
- Status of BNC cable availability at JLab?
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, November 11th, 2017
- Mark's pictures of the target from various spots in the hall File:Marks pictures of target.pdf
- Some design pictures from Ed are below: