Difference between revisions of "Meeting solid preRD cher"

From Hall A Wiki
Jump to: navigation, search
Line 4: Line 4:
 
*  Zhiwen's studies of readout test (updating from time to time) https://userweb.jlab.org/~zwzhao/maroc/mapmt_readout_1st_test.pdf  
 
*  Zhiwen's studies of readout test (updating from time to time) https://userweb.jlab.org/~zwzhao/maroc/mapmt_readout_1st_test.pdf  
  
== Monday, December 9th, 2017 ==
+
== Monday, December 16th, 2019 ==
 +
 
 +
*  Engineering status
 +
**  Updates on Tank Construction
 +
**  Updates on Stand Construction
 +
 
 +
*  Outstanding items that need to be ordered/built/procured
 +
**  Status of current orders:
 +
***  MaPMTs (Need ordering institution)
 +
***  Mirrors (ECI film ordered)
 +
***  Electronic summing board board (Final quote determined,  2-week lead time)
 +
***  Gas regulation system (ordered, still needs to be assembled)
 +
****  What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward.
 +
*** Cabling before patch-panel
 +
**** What patch cables do we need?  134 BNC patch cables?  Can we use cables from the previous prototype?  How about SHV?  Do we need 70 SHV patch cables also?
 +
*** Cabling after patch-panel
 +
**** Do we have the necessary BNC and SHV?  Can we find the lemo cables?  (Jian-Ping seems to think we can find the lemo cables at JLab)
 +
 
 +
*  Preparation of Cosmics test.
 +
**  Space at the lab?
 +
**  Electronics and cables ready?
 +
**  Schedule for bench testing calorimeter blocks and scintillators.
 +
 
 +
* MaPMT pixel test with wavelength shifter coating
 +
 
 +
*  Documentation for device
 +
**  Status of SOW's for Argonne
 +
**  Safety documentation for JLab
 +
**  Alignment, calibration, and commissioning procedures.
 +
***  Lasers to align to beam-line.
 +
**  Heavy gas fill procedure
 +
**  Run Plan
 +
**  Kinematics switch timeline/plan
 +
 
 +
== Monday, December 9th, 2019 ==
  
 
List of topics for meeting today:
 
List of topics for meeting today:

Revision as of 10:49, 16 December 2019

Meeting time is 11:00 AM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689

Monday, December 16th, 2019

  • Engineering status
    • Updates on Tank Construction
    • Updates on Stand Construction
  • Outstanding items that need to be ordered/built/procured
    • Status of current orders:
      • MaPMTs (Need ordering institution)
      • Mirrors (ECI film ordered)
      • Electronic summing board board (Final quote determined, 2-week lead time)
      • Gas regulation system (ordered, still needs to be assembled)
        • What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward.
      • Cabling before patch-panel
        • What patch cables do we need? 134 BNC patch cables? Can we use cables from the previous prototype? How about SHV? Do we need 70 SHV patch cables also?
      • Cabling after patch-panel
        • Do we have the necessary BNC and SHV? Can we find the lemo cables? (Jian-Ping seems to think we can find the lemo cables at JLab)
  • Preparation of Cosmics test.
    • Space at the lab?
    • Electronics and cables ready?
    • Schedule for bench testing calorimeter blocks and scintillators.
  • MaPMT pixel test with wavelength shifter coating
  • Documentation for device
    • Status of SOW's for Argonne
    • Safety documentation for JLab
    • Alignment, calibration, and commissioning procedures.
      • Lasers to align to beam-line.
    • Heavy gas fill procedure
    • Run Plan
    • Kinematics switch timeline/plan

Monday, December 9th, 2019

List of topics for meeting today:

  • Engineering status
    • Updates on Tank Construction
      • Is there adequate space in the current design for the scintillator arrays? Image of Design
    • Updates on Stand Construction
  • Outstanding items that need to be ordered/built/procured
    • Status of current orders:
      • MaPMTs
      • Mirrors
      • Electronic summing board board
        • Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor.
      • MAROC electronics
      • Gas regulation system
    • Status of lead block availability at JLab?
    • Status of lemo cable availability at JLab?
    • Status of BNC cable availability at JLab?
    • Status of SHV cable availability at JLab?
  • Preparation of Cosmics test.
    • Space at the lab?
    • Electronics and cables ready?
    • Schedule for bench testing calorimeter blocks and scintillators.
  • MaPMT pixel test with wavelength shifter coating
  • Documentation for device
    • Status of SOW's for Argonne
    • Safety documentation for JLab
    • Alignment, calibration, and commissioning procedures.
    • Heavy gas fill procedure
    • Run Plan
    • Kinematics switch timeline/plan

Monday, November 11th, 2017

  • Some design pictures from Ed are below:
Fig. 1: Initial work on Prototype Tank
Fig. 2: Schematic of blank circular flange
Fig. 3: Design for tank housing, with flange attachment possibilities
'Fig. 4: Schematic of circular flange with 80 BNC and 16 SVH feedthroughs
Fig. 5: Schematic of square flange option
Fig. 6: Image of square flange option
Fig. 7: Alternate view image of square flange option