− | == Monday, December 9th, | + | == Monday, December 16th, 2019 == |
+ | |||
+ | * Engineering status | ||
+ | ** Updates on Tank Construction | ||
+ | ** Updates on Stand Construction | ||
+ | |||
+ | * Outstanding items that need to be ordered/built/procured | ||
+ | ** Status of current orders: | ||
+ | *** MaPMTs (Need ordering institution) | ||
+ | *** Mirrors (ECI film ordered) | ||
+ | *** Electronic summing board board (Final quote determined, 2-week lead time) | ||
+ | *** Gas regulation system (ordered, still needs to be assembled) | ||
+ | **** What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward. | ||
+ | *** Cabling before patch-panel | ||
+ | **** What patch cables do we need? 134 BNC patch cables? Can we use cables from the previous prototype? How about SHV? Do we need 70 SHV patch cables also? | ||
+ | *** Cabling after patch-panel | ||
+ | **** Do we have the necessary BNC and SHV? Can we find the lemo cables? (Jian-Ping seems to think we can find the lemo cables at JLab) | ||
+ | |||
+ | * Preparation of Cosmics test. | ||
+ | ** Space at the lab? | ||
+ | ** Electronics and cables ready? | ||
+ | ** Schedule for bench testing calorimeter blocks and scintillators. | ||
+ | |||
+ | * MaPMT pixel test with wavelength shifter coating | ||
+ | |||
+ | * Documentation for device | ||
+ | ** Status of SOW's for Argonne | ||
+ | ** Safety documentation for JLab | ||
+ | ** Alignment, calibration, and commissioning procedures. | ||
+ | *** Lasers to align to beam-line. | ||
+ | ** Heavy gas fill procedure | ||
+ | ** Run Plan | ||
+ | ** Kinematics switch timeline/plan | ||
+ | |||
+ | == Monday, December 9th, 2019 == | ||
List of topics for meeting today: | List of topics for meeting today: |
Revision as of 10:49, 16 December 2019
Meeting time is 11:00 AM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689
- Zhiwen's studies of readout test (updating from time to time) https://userweb.jlab.org/~zwzhao/maroc/mapmt_readout_1st_test.pdf
Monday, December 16th, 2019
- Engineering status
- Updates on Tank Construction
- Updates on Stand Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs (Need ordering institution)
- Mirrors (ECI film ordered)
- Electronic summing board board (Final quote determined, 2-week lead time)
- Gas regulation system (ordered, still needs to be assembled)
- What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward.
- Cabling before patch-panel
- What patch cables do we need? 134 BNC patch cables? Can we use cables from the previous prototype? How about SHV? Do we need 70 SHV patch cables also?
- Cabling after patch-panel
- Do we have the necessary BNC and SHV? Can we find the lemo cables? (Jian-Ping seems to think we can find the lemo cables at JLab)
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Lasers to align to beam-line.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, December 9th, 2019
List of topics for meeting today:
- Engineering status
- Updates on Tank Construction
- Is there adequate space in the current design for the scintillator arrays? Image of Design
- Updates on Stand Construction
- Updates on Tank Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs
- Mirrors
- Electronic summing board board
- Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor.
- MAROC electronics
- Gas regulation system
- Status of lead block availability at JLab?
- Status of lemo cable availability at JLab?
- Status of BNC cable availability at JLab?
- Status of SHV cable availability at JLab?
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, November 11th, 2017
- Mark's pictures of the target from various spots in the hall File:Marks pictures of target.pdf
- Some design pictures from Ed are below: