+ | == Monday, January 6th, 2020 == | ||
+ | |||
+ | * Engineering status | ||
+ | ** Updates on Tank Construction | ||
+ | *** New cradle design with 80/20: [[Image:8020 Cradle 05.jpeg|none|thumb|'''Fig. 1: 80/20 cradle design'''|600px]] | ||
+ | ** Updates on Stand Construction | ||
+ | |||
+ | * Outstanding items that need to be ordered/built/procured | ||
+ | ** Status of current orders: | ||
+ | *** MaPMTs (Ordered via ANL) | ||
+ | *** Mirrors (ECI film shipped, expected today/tomorrow) | ||
+ | **** Still need to do mirror assembly, i.e. attach film to carbon fiber blank. We have lexan film with no reflective coating to test. | ||
+ | *** Electronic summing board board (Ordered, board is printed and currently in component assembly) | ||
+ | **** Also will need to have MCX connectors attached (done at JLab, if Jack hasn't disowned us) | ||
+ | *** Gas regulation system (In hand, being assembled) | ||
+ | *** Cabling between prototype and patch-panel | ||
+ | **** Cabling (Components are in hand and set up to make 150 8' BNC patch cables and ~30 patch SHV, construction this week) | ||
+ | **** Do we have the additional SHV cables at the Lab? | ||
+ | *** Cabling between patch-panel and DAQ | ||
+ | **** Do we have the necessary BNC and SHV? Can we find the lemo cables? (Who to ask, Alex?) | ||
+ | |||
+ | * Tank delivery estimate? | ||
+ | ** Assuming 2-weeks from today (Jan 20th). If we are ready sooner, we will deliver ASAP. | ||
+ | *** I'll likely be delivering the tank to JLab alone, so I will need some help loading and unloading the van. | ||
+ | |||
+ | * Preparation of Cosmics test. | ||
+ | ** Space at the lab? | ||
+ | ** Electronics and cables ready? | ||
+ | ** Schedule for bench testing calorimeter blocks and scintillators. | ||
+ | |||
+ | * Documentation for device | ||
+ | ** Safety documentation for JLab | ||
+ | ** Alignment, calibration, and commissioning procedures. | ||
+ | *** Lasers to align to beam-line. | ||
+ | ** Heavy gas fill procedure | ||
+ | ** Run Plan | ||
+ | ** Kinematics switch timeline/plan | ||
+ | *** Updated A1/d2n schedule? | ||
+ | |||
+ | |||
== Monday, December 16th, 2019 == | == Monday, December 16th, 2019 == |
Revision as of 09:55, 6 January 2020
Meeting time is 11:00 AM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689
- Zhiwen's studies of readout test (updating from time to time) https://userweb.jlab.org/~zwzhao/maroc/mapmt_readout_1st_test.pdf
Contents
Monday, January 6th, 2020
- Engineering status
- Updates on Tank Construction
- New cradle design with 80/20:
- Updates on Stand Construction
- Updates on Tank Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs (Ordered via ANL)
- Mirrors (ECI film shipped, expected today/tomorrow)
- Still need to do mirror assembly, i.e. attach film to carbon fiber blank. We have lexan film with no reflective coating to test.
- Electronic summing board board (Ordered, board is printed and currently in component assembly)
- Also will need to have MCX connectors attached (done at JLab, if Jack hasn't disowned us)
- Gas regulation system (In hand, being assembled)
- Cabling between prototype and patch-panel
- Cabling (Components are in hand and set up to make 150 8' BNC patch cables and ~30 patch SHV, construction this week)
- Do we have the additional SHV cables at the Lab?
- Cabling between patch-panel and DAQ
- Do we have the necessary BNC and SHV? Can we find the lemo cables? (Who to ask, Alex?)
- Status of current orders:
- Tank delivery estimate?
- Assuming 2-weeks from today (Jan 20th). If we are ready sooner, we will deliver ASAP.
- I'll likely be delivering the tank to JLab alone, so I will need some help loading and unloading the van.
- Assuming 2-weeks from today (Jan 20th). If we are ready sooner, we will deliver ASAP.
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- Documentation for device
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Lasers to align to beam-line.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
- Updated A1/d2n schedule?
Monday, December 16th, 2019
- Engineering status
- Updates on Tank Construction
- Updates on Stand Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs (Need ordering institution)
- Mirrors (ECI film ordered)
- Electronic summing board board (Final quote determined, 2-week lead time)
- Gas regulation system (ordered, still needs to be assembled)
- What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward.
- Cabling before patch-panel
- What patch cables do we need? 134 BNC patch cables? Can we use cables from the previous prototype? How about SHV? Do we need 70 SHV patch cables also?
- Cabling after patch-panel
- Do we have the necessary BNC and SHV? Can we find the lemo cables? (Jian-Ping seems to think we can find the lemo cables at JLab)
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Lasers to align to beam-line.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, December 9th, 2019
List of topics for meeting today:
- Engineering status
- Updates on Tank Construction
- Is there adequate space in the current design for the scintillator arrays? Image of Design
- Updates on Stand Construction
- Updates on Tank Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs
- Mirrors
- Electronic summing board board
- Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor.
- MAROC electronics
- Gas regulation system
- Status of lead block availability at JLab?
- Status of lemo cable availability at JLab?
- Status of BNC cable availability at JLab?
- Status of SHV cable availability at JLab?
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, November 11th, 2017
- Mark's pictures of the target from various spots in the hall File:Marks pictures of target.pdf
- Some design pictures from Ed are below: