(Update on INFN GEM commissioning (Evaristo, Roberto))
(Update on INFN GEM commissioning (Evaristo, Roberto))
Line 12: Line 12:
  
 
Evaristo could not attend the meeting today. Below is his updates from email
 
Evaristo could not attend the meeting today. Below is his updates from email
 
 
* My colleagues in Catania re-tested a second GEM foil that did not passed the
 
* My colleagues in Catania re-tested a second GEM foil that did not passed the
 
   Quality Check in 2015. We left dry nitrogen flushing for more than 1
 
   Quality Check in 2015. We left dry nitrogen flushing for more than 1
 
   full day. The new test has been passed: all sector currents at 550->450 V are
 
   full day. The new test has been passed: all sector currents at 550->450 V are
 
   well below 10 nA.
 
   well below 10 nA.
 
 
* thanks to Bogdan suggestions we prepared a new version of the GEM
 
* thanks to Bogdan suggestions we prepared a new version of the GEM
 
   installation procedure (still draft), that I will distribute to Todd probably
 
   installation procedure (still draft), that I will distribute to Todd probably

Revision as of 11:02, 5 February 2020

GMn GEM commissioning Meetings: WEDNESDAY 10:00am - 11:00am

Link to all previous meetings: GMn GEM Commissioning Meeting


 Kondo, 

Main topic

Update on INFN GEM commissioning (Evaristo, Roberto)

Evaristo could not attend the meeting today. Below is his updates from email

  • My colleagues in Catania re-tested a second GEM foil that did not passed the
 Quality Check in 2015. We left dry nitrogen flushing for more than 1
 full day. The new test has been passed: all sector currents at 550->450 V are
 well below 10 nA.
  • thanks to Bogdan suggestions we prepared a new version of the GEM
 installation procedure (still draft), that I will distribute to Todd probably
 tomorrow. Essentially we are coming back to the hypothesis of using a
 portable crane instead of an installation stand (which would require design
 and manufacturing).

Update on the Tracking efficiency / resolution (Andrew)

Update on UVa GEM commissioning (Kondo, Anu)

High Rate MPD readout / DAQ (Danning)

MPD decoder software (John)

Update on PREX GEM (Siyu)

AOB