Difference between revisions of "Subsystem progress tracking, 2020"
From Hall A Wiki
(→GMN Run plan document) |
|||
Line 2: | Line 2: | ||
* January 6 version [https://hallaweb.jlab.org/wiki/images/c/c1/GMN_plan_Jan6.pdf PDF] | * January 6 version [https://hallaweb.jlab.org/wiki/images/c/c1/GMN_plan_Jan6.pdf PDF] | ||
− | =Software= | + | The association of contact people with detectors is from the draft run plan document |
+ | |||
+ | |||
+ | |||
+ | =Beamline= | ||
+ | Contact person: TBD | ||
+ | |||
+ | =Target= | ||
+ | Contact person: Dave Meekins | ||
+ | |||
+ | =Moller Polarimeter= | ||
+ | Contact person: Simona Malace | ||
+ | |||
+ | =Left HRS= | ||
+ | Contact Person: Bob Michaels | ||
+ | |||
+ | ==Left HRS detector reinstallation== | ||
+ | Contact person: Jack Segal | ||
+ | |||
+ | =HV controls for SBS detectors= | ||
+ | Contact person: Bob Michaels | ||
+ | |||
+ | =SBS equipment installation= | ||
+ | Contact person: Jessie Butler | ||
+ | |||
+ | =DAQ electronics and software= | ||
+ | Contact person: Alex Camsonne | ||
+ | |||
+ | =Simulations and Data Analysis Software= | ||
+ | Contact Person: Andrew Puckett | ||
* December 15, 2019 assessment | * December 15, 2019 assessment | ||
− | = | + | =DC power for spectrometer magnets= |
+ | Contact: Jack Segal | ||
+ | |||
+ | =GEM chamber gas supply system= | ||
+ | Contact: Jack. Segal | ||
+ | |||
+ | =HCAL= | ||
+ | Contact: Brian Quinn | ||
+ | |||
+ | =BigBite DAQ and analysis= | ||
+ | Contact: Mark Jones | ||
+ | |||
+ | =BigBite Shower/PreShower= | ||
+ | Contact: Arun Tadepalli | ||
+ | |||
+ | =BigBite Timing Hodoscope= | ||
+ | Contact: Rachel Montgomery | ||
+ | |||
+ | =GRINCH= | ||
+ | Contact: Todd Averett | ||
+ | |||
+ | =BigBite GEMs= | ||
+ | Contact: Nilanga Liyanage | ||
+ | |||
+ | =GEN-RP detectors= | ||
+ | Contact: Brad Sawatzky |
Revision as of 10:51, 10 February 2020
Contents
- 1 GMN Run plan document
- 2 Beamline
- 3 Target
- 4 Moller Polarimeter
- 5 Left HRS
- 6 HV controls for SBS detectors
- 7 SBS equipment installation
- 8 DAQ electronics and software
- 9 Simulations and Data Analysis Software
- 10 DC power for spectrometer magnets
- 11 GEM chamber gas supply system
- 12 HCAL
- 13 BigBite DAQ and analysis
- 14 BigBite Shower/PreShower
- 15 BigBite Timing Hodoscope
- 16 GRINCH
- 17 BigBite GEMs
- 18 GEN-RP detectors
GMN Run plan document
- January 6 version PDF
The association of contact people with detectors is from the draft run plan document
Beamline
Contact person: TBD
Target
Contact person: Dave Meekins
Moller Polarimeter
Contact person: Simona Malace
Left HRS
Contact Person: Bob Michaels
Left HRS detector reinstallation
Contact person: Jack Segal
HV controls for SBS detectors
Contact person: Bob Michaels
SBS equipment installation
Contact person: Jessie Butler
DAQ electronics and software
Contact person: Alex Camsonne
Simulations and Data Analysis Software
Contact Person: Andrew Puckett
- December 15, 2019 assessment
DC power for spectrometer magnets
Contact: Jack Segal
GEM chamber gas supply system
Contact: Jack. Segal
HCAL
Contact: Brian Quinn
BigBite DAQ and analysis
Contact: Mark Jones
BigBite Shower/PreShower
Contact: Arun Tadepalli
BigBite Timing Hodoscope
Contact: Rachel Montgomery
GRINCH
Contact: Todd Averett
BigBite GEMs
Contact: Nilanga Liyanage
GEN-RP detectors
Contact: Brad Sawatzky