Difference between revisions of "November 6th 2020"
From Hall A Wiki
Line 4: | Line 4: | ||
**Bigbite shower : working on detector - might be a good time to try switch to CODA 3 | **Bigbite shower : working on detector - might be a good time to try switch to CODA 3 | ||
**CDet : looking at resistor for pixel adjustements - one PMT might need to be replaced - still have pedestal shift issue | **CDet : looking at resistor for pixel adjustements - one PMT might need to be replaced - still have pedestal shift issue | ||
− | ** Hodoscope :32 out of 92 finished - getting HV setup - use CAEN HV - need interface | + | ** Hodoscope :32 out of 92 finished - getting HV setup - use CAEN HV - need interface - switch hodoscope to CODA3 - tedbbdaq |
*SBS DAQ bunker | *SBS DAQ bunker | ||
** Bunker https://redmine.jlab.org/documents/118 | ** Bunker https://redmine.jlab.org/documents/118 | ||
Line 10: | Line 10: | ||
* GEM Bigbite setup | * GEM Bigbite setup | ||
* GEM INFN : running with CODA3 - no APV time puts after HW fixes - increased LV by 0.5 V - reset implemented - will set up | * GEM INFN : running with CODA3 - no APV time puts after HW fixes - increased LV by 0.5 V - reset implemented - will set up | ||
− | * GEM UVA | + | * Ben has new firmware - demonstrate 2.7 KHz rate with VME back plane using the VME320 - VTP developments needs a few weeks - Optical |
+ | |||
+ | * GEM UVA : setup crate in | ||
+ | |||
+ | *Andrew UConn PO issued for VETROC |
Latest revision as of 12:36, 6 November 2020
- Updates
- HCAL
- still error
- Bigbite shower : working on detector - might be a good time to try switch to CODA 3
- CDet : looking at resistor for pixel adjustements - one PMT might need to be replaced - still have pedestal shift issue
- Hodoscope :32 out of 92 finished - getting HV setup - use CAEN HV - need interface - switch hodoscope to CODA3 - tedbbdaq
- HCAL
- SBS DAQ bunker
- GEM Bigbite setup
- GEM INFN : running with CODA3 - no APV time puts after HW fixes - increased LV by 0.5 V - reset implemented - will set up
- Ben has new firmware - demonstrate 2.7 KHz rate with VME back plane using the VME320 - VTP developments needs a few weeks - Optical
- GEM UVA : setup crate in
- Andrew UConn PO issued for VETROC