Release Right Shield House door controls from support and drop them down - tie back to platform legs
 
Release Right Shield House door controls from support and drop them down - tie back to platform legs
 +
 +
Controls for corrector coils
  
 
Re-tap the SBS supply main transformer for full power
 
Re-tap the SBS supply main transformer for full power

Revision as of 12:36, 3 May 2021

Heaters for HMS magnet flags

Release Right Shield House door controls from support and drop them down - tie back to platform legs

Controls for corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform