Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"

From Hall A Wiki
Jump to: navigation, search
Line 8: Line 8:
  
 
Controls for corrector coils
 
Controls for corrector coils
 
Finish the installation of the Hall C Moller VME crate
 
  
 
Re-tap the SBS supply main transformer for full power
 
Re-tap the SBS supply main transformer for full power

Revision as of 14:32, 20 May 2021

Heaters for HMS magnet flags

Release Right Shield House door controls from support and drop them down - tie back to platform legs

Make replacement backup batteries for Hall C PLCs - install - install new UPS

Help Brad re-configure the DAQ rack in Counting Room C - May 17-21

Controls for corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Troubleshoot Hall A right arm snout

Install new liquid level meters on SHMS

Remove actuators from right arm magnets

HMS supply control boxes into the Shield Hut

Gas mix controller for GEM detectors