Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"

From Hall A Wiki
Jump to: navigation, search
Line 30: Line 30:
  
 
Gas mix controller for GEM detectors
 
Gas mix controller for GEM detectors
 +
 +
Fix relay box for HMS counting room E-Stops

Revision as of 15:27, 21 May 2021

Heaters for HMS magnet flags

Release Right Shield House door controls from support and drop them down - tie back to platform legs

Make replacement backup batteries for Hall C PLCs - install - install new UPS

Help Brad re-configure the DAQ rack in Counting Room C - May 17-21

Controls for corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Troubleshoot Hall A right arm snout

Install new liquid level meters on SHMS

Remove actuators from right arm magnets

HMS supply control boxes into the Shield Hut

Gas mix controller for GEM detectors

Fix relay box for HMS counting room E-Stops