Difference between revisions of "Shift How-To"
From Hall A Wiki
(→Detectors) |
(→Shift Roles) |
||
Line 2: | Line 2: | ||
== Shift Roles == | == Shift Roles == | ||
+ | |||
+ | * Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions | ||
+ | * Target Operator: Monitors the target system | ||
+ | * Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded | ||
== Reporting and Logging == | == Reporting and Logging == |
Revision as of 14:57, 8 June 2021
Contents
Overview
Shift Roles
- Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
- Target Operator: Monitors the target system
- Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded
Reporting and Logging
Taking Data
- Using the CODA DAQ
- GUI Description
- Starting a Run
- Stopping a Run
- Monitoring the data
- Online analysis
- Shift checklist
Recovery Procedures
Systems
Beam Line
- Hall A beam line drawing (to be updated)
- Checkout procedure
- spot++ (beam size verification)
- BPM calibration
- HARP scan
- Polarization Measurements
- Compton: Not Used
- Moller
Target
Magnets
- BigBite
- Super BigBite
- LHRS
Detectors
BigBite
- GEMs
- GRINCH
- Timing Hodoscope
- Preshower and Shower
Super BigBite
- GEMs
- HCAL