Difference between revisions of "Shift How-To"
From Hall A Wiki
(→Shift Roles) |
(→Shift Roles) |
||
Line 3: | Line 3: | ||
== Shift Roles == | == Shift Roles == | ||
− | * Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions | + | * '''Shift Leader:''' Executes the Run Plan according to the Run Coordinator's instructions |
− | * Target Operator: Monitors the target system | + | * '''Target Operator:''' Monitors the target system |
− | * Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded | + | * '''Data Quality Monitor:''' Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded |
== Reporting and Logging == | == Reporting and Logging == |
Revision as of 14:58, 8 June 2021
Contents
Overview
Shift Roles
- Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
- Target Operator: Monitors the target system
- Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded
Reporting and Logging
Taking Data
- Using the CODA DAQ
- GUI Description
- Starting a Run
- Stopping a Run
- Monitoring the data
- Online analysis
- Shift checklist
Recovery Procedures
Systems
Beam Line
- Hall A beam line drawing (to be updated)
- Checkout procedure
- spot++ (beam size verification)
- BPM calibration
- HARP scan
- Polarization Measurements
- Compton: Not Used
- Moller
Target
Magnets
- BigBite
- Super BigBite
- LHRS
Detectors
BigBite
- GEMs
- GRINCH
- Timing Hodoscope
- Preshower and Shower
Super BigBite
- GEMs
- HCAL