Difference between revisions of "Shift How-To"

From Hall A Wiki
Jump to: navigation, search
(Overview)
(Beam Line)
Line 29: Line 29:
  
 
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)]
 
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)]
* Checkout procedure  
+
* [[SBS checkout procedure]]
* spot++ (beam size verification)
+
* [[SBS spot++ (beam size verification)]]
* BPM calibration  
+
* [[SBS BPM calibration]]
* HARP scan
+
* [[SBS HARP scan]]
* Polarization Measurements  
+
* SBS Polarization Measurements  
 
** Compton: Not Used  
 
** Compton: Not Used  
** Moller  
+
** Moller
  
 
== Target ==
 
== Target ==

Revision as of 15:03, 8 June 2021

Overview

This page gives instructions for various aspects of the experiment relating to each of the major subsystems and shift tasks.

Shift Roles

  • Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
  • Target Operator: Monitors the target system
  • Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded

Reporting and Logging

Taking Data

  • Using the CODA DAQ
    • GUI Description
    • Starting a Run
    • Stopping a Run
  • Monitoring the data
  • Online analysis
  • Shift checklist

Recovery Procedures

Systems

Beam Line

Target

Magnets

  • BigBite
  • Super BigBite
  • LHRS

Detectors

BigBite

  • GEMs
  • GRINCH
  • Timing Hodoscope
  • Preshower and Shower

Super BigBite

  • GEMs
  • HCAL